Laserfiche WebLink
<br />Chapter 2 CEQA Findings <br />Table 2-1 CEQA Findings <br />Level of <br />Significance after <br />Impact Statement Evidence/Rationale Supporting Findings Mitigation Measures Findings Mitigation <br />commencement of work in any contaminated <br />area. <br />MM4.5-3 Prior to the demolition of structures <br />that were constructed before 1980, a <br />thorough investigation shall be completed to <br />determine if asbestos, lead, or PCBs exist on <br />the site. All demolition that could result in the <br />release of lead and/or asbestos must be <br />conducted according to Cal/OSHA standards. <br />Impact 4.5-3 Construction Two school facilities are located within the MM4.5-1 and MM4.5-2 above, would apply to Finding 1 Less than <br />this impact. significant <br />activities associated with the proposed Transit Zoning Code (SD 84A <br />The City finds that changes or alterations have <br />implementation of the Transit and SD 84B) area. Construction activities <br />been required in, or incorporated into, the <br />Zoning Code would result in would result in diesel emissions <br />project which would avoid or substantially <br />the handling of hazardous associated with diesel-powered trucks and <br />lessen the significant environmental effect as <br />materials, substances, or equipment and the potential for site <br />identified in the final EIR. <br />waste within one-quarter mile contamination. However, compliance with <br />of an existing school. <br />all applicable State, and federal laws and <br />regulations, regulate, control, or respond <br />to hazardous waste, transport, disposal, or <br />clean-up in order to ensure that hazardous <br />materials do not pose a significant risk to <br />nearby receptors. If ground contamination <br />is found within close proximity to a school <br />site before or during construction, further <br />implementation of mitigation measures <br />MM4.5-1 and MM4.5-2 would ensure the <br />health and safety of all students. <br /> <br />Discussion is provided on pages 4.5-17 of <br />the DEIR. <br />Impact 4.5-4 The Transit Implementation of the proposed project MM4.5-2 and MM4.5-3 listed above, would Finding 1 Less than <br />also apply to this impact. significant <br />Zoning Code (SD 84A and would lead to development of sites <br />The City finds that changes or alterations have <br />SD 84B) includes sites which identified on various regulatory databases <br />been required in, or incorporated into, the <br />are included on a list of as being contaminated from release of <br />Revised Station District Project and FOL Settlement Agreement Findings of Fact/Statement of Overriding Considerations 2-27 <br /> <br />