My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-023 - Development Agreement Between the Community Redevelopment Agency
Clerk
>
Resolutions
>
CITY COUNCIL
>
2011 -
>
2011
>
2011-023 - Development Agreement Between the Community Redevelopment Agency
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2012 4:16:00 PM
Creation date
5/4/2011 2:08:10 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
2011-023
Date
4/18/2011
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Chapter 2 CEQA Findings <br />Table 2-1 CEQA Findings <br />Level of <br />Significance after <br />Impact Statement Evidence/Rationale Supporting Findings Mitigation Measures Findings Mitigation <br />of MM4.6-1, which requires the use of shall incorporate all necessary Best <br />BMPs through the preparation of required Management Practices (BMPs) and other <br />water quality-related documents (SWPPP City requirements to eliminate polluted <br />and WQMP), would reduce this impact to runoff until all construction work for the <br />below the level of significance. <br />project is completed. The SWPPP shall <br />include treatment and disposal of all <br />dewatering operation flows, and for <br />nuisance flows during construction. The <br />SWPPP may include, but would not <br />necessarily be limited to, the following <br />applicable measures: <br />Minimum required pavement widths <br />¦ <br />for residential streets needed to <br />comply with all zoning and applicable <br />ordinances <br />Use permeable materials for private <br />¦ <br />sidewalks, driveways, parking lots, or <br />interior roadway surfaces <br />Reduce the overall imperviousness <br />¦ <br />associated with parking lots by using <br />pervious materials in spillover parking <br />areas <br />Direct rooftop runoff to pervious <br />¦ <br />areas and avoid routing rooftop runoff <br />to the roadway or the stormwater <br />conveyance system <br />Biofilters including vegetated swales <br />¦ <br />and strips <br />Extended/dry detention basins <br />¦ <br />Infiltration basin <br />¦ <br />Infiltration trenches or vaults <br />¦ <br />Catch basin inserts <br />¦ <br />Continuous flow deflection/separation <br />¦ <br />Revised Station District Project and FOL Settlement Agreement Findings of Fact/Statement of Overriding Considerations 2-31 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.