My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-023 - Development Agreement Between the Community Redevelopment Agency
Clerk
>
Resolutions
>
CITY COUNCIL
>
2011 -
>
2011
>
2011-023 - Development Agreement Between the Community Redevelopment Agency
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2012 4:16:00 PM
Creation date
5/4/2011 2:08:10 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
2011-023
Date
4/18/2011
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chapter 2 CEQA Findings <br />Table 2-1 CEQA Findings <br />Level of <br />Significance after <br />Impact Statement Evidence/Rationale Supporting Findings Mitigation Measures Findings Mitigation <br />systems <br />Storm drain inserts <br />¦ <br />Media filtration <br />¦ <br />Foundation planting <br />¦ <br />Catch basin screens <br />¦ <br />Normal flow storage/separation <br />¦ <br />systems <br />Clarifiers <br />¦ <br />Filtration systems <br />¦ <br />Primary waste water treatment <br />¦ <br />systems <br />Dry Wells <br />¦ <br />Cistern <br />¦ <br />b. A WQMP shall be prepared, maintained, <br />and updated as needed to satisfy the <br />requirements of the adopted NPDES <br />program. The plan shall incorporate water <br />quality measures for all improved phases <br />of the project. <br />Impact 4.6-3 Development Future development in the Transit Zoning MM4.6-1 would also apply to this impact. Finding 1 Less than <br />significant <br />under the Transit Zoning Code area would result in minor <br />The City finds that changes or alterations have <br />Code (SD 84A and SD 84B) alterations to drainage, such as changes <br />been required in, or incorporated into, the <br />could alter the existing in ground surface permeability via paving, <br />project which would avoid or substantially <br />drainage pattern of the area or changes in topography via grading and <br />lessen the significant environmental effect as <br />and potentially result in excavation. However, adherence to <br />identified in the final EIR. <br />erosion and siltation. <br />existing regulations and implementation of <br />MM4.6-1 which requires future <br />development to prepare a storm drain plan <br />and WQMP would reduce the volume of <br />sediment-laden runoff discharge from the <br />sites within the project area. As such, <br />because future projects would projects are <br />2-32 Revised Station District Project and FOL Settlement Agreement Findings of Fact/Statement of Overriding Considerations <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.