My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KANA PIPELINE, INC.
Clerk
>
Contracts / Agreements
>
PROJECTS
>
Completed Projects
>
KANA PIPELINE, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2024 3:05:06 PM
Creation date
5/17/2011 9:03:29 AM
Metadata
Fields
Template:
Contracts
Company Name
Kana Pipeline, Inc.
Contract #
11-6406
Agency
Public Works
Council Approval Date
5/16/2011
Expiration Date
3/2/2012
Notes
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M fffT TAT ♦ 1i1�Til� t <br />MEMORANDUM <br />Paul Walters <br />To: Interim City Manager <br />Raul Godinez II, Executive Director <br />From: Public Works Agency <br />Date: February 6, 2012 <br />Subject: PROJECT NO. 11 -6406 <br />CONCRETE STREET WATER MAIN IMPROVEMENTS(VARIOUS LOCATIONS) <br />CHANGE ORDER NO. 1 <br />Contractor: Kana Pipeline, Inc. <br />1639 E. Miraloma Avenue <br />Placentia, CA 92870 <br />Project Description: CONCRETE STREET <br />LOCATIONS) <br />Change Order Number: 1 <br />Account Unit: 06617647 <br />Account: 66301 <br />Activity: 11640601028 <br />Original Contract Cost: $723,755 <br />WATER MAIN IMPROVEMENTS (VARIOUS <br />Amount: $37,545 <br />% of Original <br />Amount of The <br />Change Order: $37,545 5.2% <br />Previously Approved $ -0- 0% <br />Change Orders: <br />Total Change Orders: $37,545 5.2% <br />REASON FOR CHANGES <br />1. The Water Department requested to lower the new 12" PVC water main on the west <br />side of Raitt Street from 5`h Street to Civic Center Drive. After excavation, the proposed <br />connection was 4 feet below the depth required by the contract. Therefore, the tie -in <br />required additional excavation, shoring, fittings, thrust blocks and pipe. Prior approval <br />was obtained on September 15, 2011. <br />FINAL COST = $8,076 <br />
The URL can be used to link to this page
Your browser does not support the video tag.