Laserfiche WebLink
RFA Change Order No. 1 <br />Project 11 -6406 <br />RFA Change Order No. <br />February 6, 2012 <br />Page 2 <br />2. While installing the new water main along Raitt Street between Civic Center Boulevard <br />and Fifth Street, a 12 -inch gas line that is shown on the plan and an AT &T encasement <br />where in conflict with the alignment of the new water main. Since these utilities cannot <br />be relocated, the contractor installed the water main at a depth of 6.5 feet instead of <br />4.5 feet at two different locations. Prior approval was obtained on September 15, 2011. <br />FINAL COST = $16,089 <br />3. Unmarked utilities were encountered during the water main installation at the <br />intersections of 5th and Baker Streets. As a result, the water main was re- routed in <br />order to avoid these utilities. Prior approval was obtained on September 15, 2011. <br />t- -Ww I I � <br />Raul Godinez, II <br />Executive Director <br />Public Works Agency <br />FINAL COST = $13,380 <br />APPROVED AS TO FUNDS AND ACCOUNTS: <br />Francisco Gutierrez (� <br />Executive Director ^� <br />Finance and Management Services Agency <br />KAConstmctiw \Projects \11 -6406 \Change Orders \11-6406 RFA CO 1.dw <br />