Laserfiche WebLink
7.6.2 The contractor shall final water the skinned brickdust to a depth of/4" minimum. <br />8.0 Rainy Weather/Wet Field Procedure <br />8.1 On the next scheduled working day after a rainfall, the following procedure, in the order listed, shall be <br />adhered to: <br />8. 1.1 Remove all standing water from low spots either by skimming off excess water and spreading it out <br />to dry areas or using a pump/sopper system. <br />8.1.2 Rake out (scarify) wet areas. <br />8.1.3 Apply Dry Gail Materials "Pro Gold with Stabilizer" Brickdust Materials from stock to all Wet <br />Areas and Rake Out. <br />9.0 Work to be Completed "BI-MONTHLY" <br />9.1 To maintain levelness of all fields, contractor shall, once every two months, scarify drag built up amounts of <br />materials at high spots and cut and level drag the scarified material to low spots. The Contractor shall fill <br />any remaining low spots with new Gail Materials "Pro Gold with Stabilizer" brickdust from stock and make <br />level. <br />Note: Staff shall identify areas to scarify/cut and level drag to the contractor at weekly meetings with <br />contractors appointed site supervisor (as per section 6.2 of contract). <br />9.2 Heavy water scarified and cut and leveled areas to a `/2" min. depth and allow settling in before play on field. <br />Note: Due to heavy watering and its need to settle before play, staff shall provide a schedule of bi-monthly <br />scarify/cut and level drag dates to contractor. <br />10.0 Work to be Completed "ANNUALLY" <br />10.1 Each year, the following renovation is to be done on all fields in conjunction with the City's Annual Sports <br />Turf Renovation Schedule. Fields renovated may change from year to year. <br />10. Contractor shall laser grade each ball diamond. Contractor shall scarify drag built up amounts of <br />materials at high spots and cut and level drag the scarified material to low spots. The Contractor <br />shall fill any remaining low spots with new Gail Materials "Pro Gold with Stabilizer" brickdust <br />from stock and make level. <br />Note: Staff shall identify areas to scarify/cut and level drag at the November meeting with <br />contractor's owner (as per section 6.3 of contract). <br />10. 1.2 Contractor shall verify all base distances, pitching rubber distances and pitching mound heights per <br />the Little League, Pony/Colt League specifications for each specific field. Contractor shall repair <br />any specifications not being met on any field. <br />10.1.3 In addition, contractor shall install 1/2" new Gail Materials "Pro-gold with Stabilizer" (brickdust) to <br />in-fields at all diamonds (minimum 26 tons per Girls Softball/Major Little League Field and <br />minimum 40 tons per Junior/Senior Little League Field). Also, the contractor shall install a <br />minimum of 1 ton of Turface calcite clay per Girls Softball/Major Little League Field and 2 tons of <br />Turface calcite clay to Junior/Senior Little League Fields Responsibility for and purchase of <br />necessary materials shall be at contractor's expense. <br />2 SE 30446