Laserfiche WebLink
E . IBIT "C" <br />Cost Proposal <br />1. Itemized Estimated Breakdown for CM Services <br />A. Personnel by Classlflcatton/Responsibility <br />The following cost proposal assumes that the Contractor will have idle time due to rainy seasons. <br />CM/RE <br />Construction Manager/Resident Engineer $ 170.00 1,248 <br />Subtotal $ 212,160.00 <br />(n pact font <br />Construction Inspector $ 130.00 2,400 <br />Subtotal $ 312,000.00 <br />Category Subtotal $ 524,160.00 <br />Ofilw En ii-- ;J-i; awt Controls <br />Diaz Consultants - DBE subconsuftant <br />Office Engineer/Project Controls/Office Assistance As Required <br />Subtotal $ 37,425.00 <br />WRC Consulting - UDBE subconsultent <br />Office Engineer/Project Controls/Office Assistance $ As Required <br />Subtotal $ 45,969.00 <br />Category Subtotal $ 83,394.00 <br />TOTAL ESTIMATED PERSONNEL COST $ 607,554.00 <br />B. Additional Resident Engineer and Inspection Services It No Idle Time Is Utilized <br />by the Contractor and Subject to City Approval. <br />Construction Manager/Resident Engineer As <br />Needed $170.00 / hour <br />Construction Inspector As <br />Needed $130.00 / hour <br />Category Subtotal $30,000.00 <br />Subtotal of A and B a $ 637,554.00 <br />NOR City of Santa Ana I Public Works Agency Page I 1 <br />First Street'Bridge Replacement I Construction Management