Laserfiche WebLink
II. Contingency Services <br />CM/RE <br />Construction Manager/Resident Engineer $ 170.00 600 $ 102,000.00 <br />Inspections <br />Construction inspector $ 130.00 600 $ 78,000.00 <br />III. Grand Totals <br />Grand Tofal of 1. and 11. above = $ 817,554.00 <br />Notes: <br />1. Construction duration is estimated at 24 months. <br />2. Inspectors will be fully equipped with vehicles, computers, tools, and equipment required to <br />perform their tasks (included in our hourly rate). <br />3. Overtime rates are calulated at 1.5 times the hourly rate for construction inspectors. All <br />overtime shall be pre-approved by the City. <br />4. Client to provide field office and field office equipment. <br />City of Santa Ana I Public Works Agency Page 12 <br />First StreetBridge Replacement I Construction Management