Laserfiche WebLink
Sean Rouhani, Pi: <br />Construction Manager/Resident Engineer - - - - <br /> ? 28 Years of <br />Mr. Rouhani has more than 28 years of construction management experience Construction <br />workingoncomplex projects includingstructuresconstruction overwaterways Management <br />with construction in the channels. He worked for Caltrans Department of ? Bridges, Roadways; <br />Structures and Construction for 7 years and has been a senior project manager & Interchanges <br />for 6 years. As a resident engineer he has worked on a number of projects that <br />have included structures demolition, new structures construction, structures ? Extensive Caltrans <br />construction in waterways, interchange construction, structures widening RE Experience <br />over flood control channels, roadways widenings, and signal modifications. ? Resident Engineer <br />Mr. Rouhani has worked on publicly sensitive projects, which required Working with RR <br />intensive coordination with local residents and business owners (2 miles of ? Federal & State <br />Nisqualli Road improvements and 260 residences) and SR-605/Carson Street Funding Expertise' <br />Interchange, which was constructed near the major Carson Street Shopping <br /> <br />Mall in Long Beach. As a resident engineer Mr. Rouhani has administered over ? Public Relations <br />$1 billion in construction projects and demonstrated technical excellence, ? CPM Scheduling <br />objectivity, and clarity while maintaining project schedules and identify Knowledge <br />critical reviews and milestones. <br /> ? Project Controls & <br /> <br />Experience Staffing Expertise <br /> ? Claims Management <br />1-405/Del Amo Boulevard Overcrossing, City of Carson, CA <br />PM/Resident Engineer responsible for contract and construction management Education: <br />of a 1,200 foot long bridge over the Dominguez Channel with construction of Bs, Civil Engineering <br />two 65 foot tall piers inside the channel. The bridge spanned over the 1-405 with <br /> <br />the piers constructed on driven piles and spread footings, for which construction Registration: <br />CA, Civil Engineer <br />occurred during the dry season. Work within the channel required additional No. C43572 <br />permits such as Fish & Game, Water Quality Board, and Flood Control District to <br />be acquired and enforced during construction. Special attention was paid to low <br />and high tide conditions during construction to avoid any biological alteration. <br />The project also included roadway construction on both sides of the structure, <br />which included widening, paving, utility relocation, electrical, and landscaping. <br />Construction cost $15 million. <br />1-105 Freeway Construction, Los Angeles, CA <br />Resident Engineer for 2 miles of new 1-105 freeway construction, including <br />construction of 2 interchanges, 4 bridges, 4 freeway overcrossings (bridges), <br />drainage facilities, utlity relocation, grading and paving, electrical, and <br />landscaping. The project included the realignment of a portion of the <br />Dominguez Channel, requiring work during the dry season within the channel. <br />Construction cost $60 million. <br />h??L City of Santa Ana I Public Works Agency <br />First Street Bridge Replacement I Construction Management Page 1