Laserfiche WebLink
Zouheir Soleh, P <br />Quality Assurance/Quality Control <br /> ? 31 Years of Caltrans <br />Mr. Saleh has 31 years of construction management experience working for Experience <br />Caltrans Department of Structures. He has worked on variety of structures ? 15 Years as Caltrans <br />project such as new freeways, bridges, interchanges, seismic retrofit projects, Senior Structures <br />structures rehabilitation projects, historic structures renovation, retaining Engineer <br />walls, MSE walls, sound walls, culverts, tunnels, and overhead structures. He ? <br /> <br />has worked on project including falsework, shoring review, processing change 2 Years as Instructor <br />of Resident Engineer <br />orders, resolving conflicts, coordination with designers, and resolves all field Academy <br />issues. He has worked on all aspects of structures construction and is an <br /> <br />expert in contract documentation, falsework design and approval, structures ? Recipient of <br /> <br />construction documentation procedures, claim resolution procedures, DRB Numerous <br />Achievement Awards <br />selection committees, and contract closeout. In depth understanding of <br />Caltrans Standard Specifications, Construction Manual, Bridge Construction ? Traffic Control, <br />Record and Procedure, Safety committee, Technical expertise in bridge Safety, & SWPPP <br />construction, falsework and shoring evaluations, wet pile construction, CIDH ? State & Federally <br />pile construction, retaining walls, Soundwalls, and MSE wall construction, Funded Project <br />seismic retrofit of bridges and demolition, oversight of construction work. Expertise <br />Prior Experience Education: <br /> BS, Civil Engineering <br />1-405/Del Arno Boulevard Overcrossing (Dominguez Channel Bridge), <br />Caltrans District 7, Carson, CA Registration: <br /> <br />Senior Structure Engineer responsible for construction oversight on this $10 CA, Civil Engineer, <br />No. 82441 <br />million project consisting of a precast concrete girder bridge spanning over <br />Dominguez Channel and 1-405 at Del Amo Boulevard. This project involved certifications: <br />abutment retrofit, pile caps for lateral stability, and foundation retrofit by the District Instructor <br />addition of steel shell pipe piles. for ream Building <br /> Structure Inspection <br />1-710 Eastside/Compton Creek BOH, Los Angeles <br />CA <br />, Office Procedures and <br />Three span bridge widening over Compton Creek involving cofferdams Contract Administration <br />construction and piling to support erection of falsework. CPM Scheduling <br /> <br />San Gabriel River Bridge Retrofit, Los Angeles, CA Contract Change Order <br />Chang <br /> <br />This project consisted of 5 spans over the San Gabriel River involving the Bridge Fa <br />k Academy <br /> <br />retrofit of piers and abutments, replacement of bearing pads, and construction Resident Engineer <br />Workshop and Academy <br />of falsework to temporarily lift the bridge for the retrofit. Partnering on <br /> <br />Balogna Creek Bridge Widening, Culver City, CA Caltrans Projects <br /> <br />This project involved the erection of falsework in the water stream for the Construction Storm Water <br />Prevention and Pollution <br />widening of the 3 span bridge. Construction Surveys <br /> Dispute Review Board <br />MILL City of Santa Ana Public Works Agency Page I 1 <br />First Street Bridge Replacement I Construction Management