Laserfiche WebLink
the interchange Improvements: <br />(a) Irvine shall be liable to Santa Ana for Irvine's share of <br />the Total Costs (as.defined in Section 2 hereinbelow) of <br />the Interchange Improvements, to the extent such Total <br />Costs remain outstanding, and shall pay such amount to <br />Santa Ana. Any amounts received by Santa Ana pursuant to <br />this paragraph for the interchange Improvements shall be <br />expended by Santa Ana in accordance with Section 3 <br />hereinbelow. <br />(b) Irvine shall deposit the Total Costs (as defined in <br />Section 2 hereinbelow) of the Roadway Improvements, to <br />the extent such Total Costs remain outstanding, in an <br />interest bearing account in a financial institution <br />acceptable to both.Irvine and Santa Ana. Irvine shall <br />not withdraw any of the principal of such amount except <br />in connection with the design and construction of the <br />Roadway Improvements, including but not limited to <br />alignment studies and any environmental documentation <br />which may be necessary in addition to the IBC EIR, costs <br />of land acquisition (including any costs incurred in any <br />eminent domain action), costs of design and construction, <br />and administrative staff costs related to the Roadway <br />Improvements. Any and all interest earned on the amounts <br />deposited in such account shall be paid to Santa Ana. <br />Notwithstanding anything to the contrary in the IBC EIR or in <br />the environmental findings approved by Irvine in its approval of <br />FM%131%038170-0M05%202"12.1 1112DM 3