My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AECOM (FORMERLY DMJM HARRIS) 4A-2011
Clerk
>
Contracts / Agreements
>
A
>
AECOM (FORMERLY DMJM HARRIS) 4A-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2021 3:02:46 PM
Creation date
6/28/2011 11:26:46 AM
Metadata
Fields
Template:
Contracts
Company Name
AECOM (FORMERLY DMJM HARRIS)
Contract #
A-2011-061
Agency
COMMUNITY DEVELOPMENT
Council Approval Date
3/7/2011
Destruction Year
2026
Notes
A-2008-216
Document Relationships
AECOM 4B -2013
(Amended By)
Path:
\Contracts / Agreements\A
DMJM HARRIS 4 -2008
(Amends)
Path:
\Contracts / Agreements\D
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AECOM <br />AECOM <br />999 IN. To -an & Country Road. Orange, CA 9226B <br />T 714.567,2501 F714.567,2441 YNAv.aecont.com <br />The cost of the architectural service is based on each parking structure and its scope of work. <br />3" Street and Birch Parking Structure: <br />Architectural scope of work: <br />AECOM will perform a one day Field Investigation to review the accuracy of the architectural as -built <br />documentation for the areas of improvement described below. <br />AECOM will prepare a design solution and construction documents for the addition of two (2) new <br />overhead roll -up doors at the existing East vehicle entrance. <br />AECOM will prepare a design solution and construction documents for the addition of a new security <br />fence at the perimeter of Level 2. <br />AECOM will review the existing conditions, propose design solutions and prepare construction <br />documents for access compliance improvements for the following limited areas as directed by the Owner: <br />Path of travel at Southwest of parking structure to Include relocation of handicap parking stall, <br />reconfiguration of egress gate and landings, and path of travel from egress door to the adjacent <br />sidewalk. <br />Fall protection at both stair towers in the Northeast and Southwest <br />Our review of the existing conditions Includes only those items listed and Is not a complete <br />analysis of the accessibility compliance of the parking structure. Other known deficiencies will not <br />be addressed per Owner direction. <br />AECOM will prepare a design solution and construction documents for the demolition and replacement of <br />existing security screens (including metal plate blocking at existing panic hardware) at all pedestrian <br />egress gates and stairs on Level 1. <br />AECOM will review shop drawings, and prepare RFI responses for the scope described above during the <br />construction phase. We will complete three (3) one day site visits for construction observation during the <br />construction phase. <br />The proposed stipulated sum for the scope described is $32,350 <br />Field Investigation $1.015 <br />Design and Construction Documentation $25,755 <br />Construction Phase Services $5,580 <br />V Street and Broadway Parking Structure <br />Architectural scope of work: <br />AECOM will perform a one day Field Investigation to review the accuracy of the architectural as -built <br />documentation for the areas of improvement described below. <br />AECOM will prepare a design solution and construction documents for the addition of three (3) new <br />overhead roll -up doors at the existing North, South and East vehicle entrances, and each has an <br />adjacent fencing extension includes a pedestrian gate. <br />AECOM will prepare a design solution and construction documents for the addition of a new security <br />fence at the perimeter of both Level 1 and Level 2. <br />AECOM will prepare a design solution and construction documents for the addition of two (2) pedestrian <br />gates and adjacent 5-fool fencing extension both sides to secure entry from pedestrian bridges at the <br />North and East perimeters. <br />Review or Improve the accessibility compliance of the parking structure is not In the scope of work per <br />Owner directive. <br />AECOM will review shop drawings, and prepare RFI responses for the scope described above during the <br />construction phase. We will complete three (3) one day site visits for construction observation during the <br />construction phase. <br />The proposed stipulated sum for the scope described Is $31.215 <br />Field Investigation $1.015 <br />Design and Construction Documentation $23,850 <br />Construction Phase Services $6,350 <br />,l)r.. 'rArr:;,r'-1.; 1 1 1.,, <br />
The URL can be used to link to this page
Your browser does not support the video tag.