Laserfiche WebLink
Electrical Engineering <br />Note: It is our understanding that the lighting improvements within this structure will be undertaken by PCI <br />and we have therefore not included any hours for that task or item. AECOM will: <br />Verify as -built drawings. <br />Power plans to include the upgrade of gate arm controls and the installation of electrically operated <br />overhead roll -up doors. <br />Prepare electrical drawings and book specifications for electrical upgrade works. <br />Coordinate with other consultants and governing agencies as required. <br />Respond to plan review. <br />Review contractor submittals. <br />Structural Enaineerina <br />Support of architectural security enhancements. <br />The total cost of the service is $57,950. This cost Is based on the following breakdown: <br />Engineering/Mgmt <br />$ <br />7,300 <br />Engineering/Mgmt <br />$ <br />2,400 <br />Architectural Engr <br />$ 32,350 <br />Electrical Engr <br />$ <br />6,700 <br />Structural Engr <br />$ <br />7,700 <br />Cost Estimate <br />$ <br />1.500 <br />Total Cost (this location): $ 57,950 <br />(Design Phase — coord, mgmt, bid document) <br />(CA) <br />(Design and CA) <br />(parking controls electrical) <br />(Design and CA) <br />AECOM Engineering/Mgmt cost for the design phase is based upon: <br />20 hours of coordination <br />16 hours to prepare bid documents (will be reduced if Fiesta is Included since hrs overlap effort) <br />12 hours CA <br />5th and Main Street Parking Structure <br />AECOM's scope of work generally includes: <br />Incorporation of security bars/grilles to second story of parking structure; replacement of concrete panel <br />on second story along Main Street side of structure; Incorporation of electrical equipment as needed to <br />accommodate management booth. <br />For architectural services detailed scope of work see Attachment A. <br />Electrical Enaineering <br />Verify as -built drawings. <br />Power plans to include the upgrade of gate arm controls, booths, and installation of electrically operated <br />roll -up gates. <br />Prepare electrical drawings and book specifications for electrical upgrade works. <br />Coordinate with other consultants and governing agencies as required. <br />Respond to plan review. <br />Review contractor submittals. <br />Structural Enaineerina <br />Support of architectural security measures. <br />The total cost of the service Is $43,475. This cost is based on the following breakdown: <br />Engineering/Mgmt $ 3,250 (Design Phase —coord, mgml, bid document) <br />Engineering/Mgml $ 1,625 (CA) <br />Architectural Engr $ 20,600 (Design and CA) <br />!IJ ('E) d lf�!): nr!:a,.nr. 'IAECONI <br />