Laserfiche WebLink
Electrical Engr $ 9,600 <br />Structural Engr $ 7,000 <br />Cost Estimate $ 1,500 <br />Total Cost (this location): $ 43,475 <br />(maintenance hub and typical work) <br />(Design and CA) <br />AECOM EngineeringlMgmt cost for the design phase is based upon: <br />16 hours of coordination <br />16 hours to prepare bid documents (will be reduced if Fiesta is included since hrs overlap effort) <br />8 hours CA <br />3rd and Broadway Parking Structure <br />AECOM's scope of work generally Includes: <br />Incorporation of security bars for first and second stories of structure; equip exterior doors with egress <br />only hardware and panic hardware; roll -up grilles at three locations within structure; install gales on two <br />locations to limit access across pedestrian bridges; upgrade all lighting within structure; add lighting to <br />exterior alcove on southeast portion of structure; and update electrical drawings by other for incorporation <br />into package. <br />Resolution of low point on lop story which results in ponding on top floor, and installation of a new booth <br />and electric gates within the garage will be by others. That work is not included in this scope or work. <br />For architectural services detailed scope of work see Attachment A. <br />Electrical Engineering <br />Verify as -built drawings. <br />Upgrade existing lighting; where now fixtures are required, exposed conduit will be specified. <br />Power plans to Include upgrade of gate controls, booths, and overhead roll -up gates. <br />Prepare electrical drawings and book specifications for electrical upgrade works. <br />Coordinate with other consultants and governing agencies as required. <br />Respond to plan review. <br />Review contractor submittals <br />Structural Engineering <br />The total cost of the service is $63,775. This cost Is based on the following breakdown: <br />Engineering/Mgml <br />$ 8,100 <br />EngineeringlMgmt <br />$ 2,760 <br />Architectural Engr <br />$ 31,215 <br />Electrical Engr <br />$ 12,500 <br />Structural Engr <br />$ 7,700 <br />Cost Estimate <br />$ 1,600 <br />Total Cost (this location): <br />$ 63,775 <br />(Design Phase — coord, mgml, bid document) <br />(CA) <br />(Design and CA) <br />(new lighting plus typical) <br />(Design and CA) <br />AECOM Engineering/Mgmt cost for the design phase is based upon: <br />20 hours of coordination <br />20 hours to prepare bid documents (will be reduced if Fiesta is included since hrs overlap effort) <br />12 hours CA <br />AECOM <br />