My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ICF INTERNATIONAL (JONES & STOKES ASSOCIATES, INC.) - 2011
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2017
>
ICF INTERNATIONAL (JONES & STOKES ASSOCIATES, INC.) - 2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2024 3:24:27 PM
Creation date
7/19/2011 1:32:08 PM
Metadata
Fields
Template:
Contracts
Company Name
ICF INTERNATIONAL
Contract #
A-2011-136
Agency
PLANNING & BUILDING
Council Approval Date
5/16/2011
Insurance Exp Date
6/25/2013
Destruction Year
2017
Notes
UC on agmt exp date
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Environmental Consulting Services (2oo East First American Way) I City of Santa Ana <br />The cumulative impacts analysis will focus on the potential for environmental impacts from this project, along with other <br />proposed and reasonably foreseeable projects in the area. We will develop the list of cumulative projects in coordination <br />with City staff, and reach out to surrounding jurisdictions. We will evaluate and discuss the project's contribution to the <br />overall cumulative baseline to identify any potential "cumulatively considerable" impacts. <br />ICF will prepare a fully edited Administrative Draft IS/MND for the City's review and comment. Following the City's review <br />of the administrative draft documents, ICF will incorporate the City's comments and will revise the document accordingly. <br />Per City direction, we have included two rounds of administrative draft submittals. <br />'ir>(ivz° zai <br />■ Screencheck Draft IS/MND including all Technical Studies — 5 hardcopies and two rounds of review are included in the <br />budget <br />■ Electronic files and CD of the Screencheck Draft IS/MND <br />Task 4. Prepare and Circulate Public Draft IS/MND and NOC <br />Upon the City's approval of the Administrative Draft IS/MND, we will prepare and produce the public Draft IS/MND for <br />public review. ICF will prepare a Notice of Intent (NOI) for posting at the County Clerk. ICF will circulate the IS/MND for a <br />30-day public review period. We will work in consultation with City staff to develop a distribution list for the IS/MND, we <br />will distribute the document to state and local agencies, and other recipients for public review and comments, as <br />determined by the City and we will post the NOI at the County Clerk's office. We will draft the notice for the City to place in <br />a newspaper of regional circulation. <br />■ Print and mail up to 20 copies of the Public Review IS/MND. <br />■ 20 CDs containing Adobe Acrobat files of the Draft IS/MND <br />■ Post NOI at the County Clerk. <br />■ Provide newspaper notice. <br />■ Print NOI suitable for distribution (up to 5o copies). <br />■ Provide PDF version suitable for the City to post on the City website. <br />Task 5. Prepare Response to Comments and Final IS/MND <br />Prepare Roip,,,iso o Comments <br />ICF will work closely with City staff to prepare responses to comments for comment letters received during the public <br />review period. Traffic related comments will be coordinated with, and responded by LLG. These responses to comments, <br />along with any changes to the IS/MND, will be submitted to the City first as an Administrative Final IS/MND. We assume 5o <br />hours of ICF technical staff's time to respond to comments. Additionally, 12 hours of Senior Transportation Engineer <br />support and 4 hours of Principal Traffic Engineer support is allocated for response to comments within the TIA budget. <br />Prop.ma Vit a;%c,n. 41 nitorinct, and Rnparring Program <br />ICF will prepare a Mitigation Monitoring and Reporting Program (MMRP) that will identify mitigation measures, timing, <br />responsibility for implementation, and monitoring methods. We will work with City staff to identify appropriate <br />responsible parties, methods, and timing. ICF will provide the MMRP in conjunction with the screen -check Final IS/MND. <br />Oetiver,ibi: ' <br />■ Admin Final IS/MND — 5 hardcopies and i CD <br />Use or disclosure of data contained on this sheet is subject <br />to the restriction on the title page of this proposal. to Page 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.