My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75A - PH - RESO TO MODIFY CMD BOUNDARIES
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
08/24/2011
>
75A - PH - RESO TO MODIFY CMD BOUNDARIES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2016 4:56:34 PM
Creation date
8/18/2011 1:27:18 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Community Development
Item #
75A
Date
8/24/2011
Destruction Year
2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Finding 6. From Section 4(b): "All assessments must be supported by a detailed engineer's report prepared by <br />a registered professional engineer certified by the State of California ". <br />This report serves as the "detailed engineer's report" to support the benefit property assessments proposed to be <br />levied within the Modified Downtown Santa Ana CMD. <br />Finding 7. From Section 4(c): "The amount of the proposed assessment for each parcel shall be calculated <br />(along with) the total amount thereof chargeable to the entire district, the duration of such payments, the <br />reason for such assessment and the basis upon which the amount of the proposed assessment was calculated." <br />The individual and total parcel assessments attributable to special property benefits are listed on Attachment 1 to this <br />Report. The District and resultant assessment payments will continue for the remaining three years of the 5 year CMD <br />term and may be renewed again at that time. The reasons for the proposed assessments are outlined in Finding 2 <br />above as well as in the Modified Management District Plan. The calculation basis of the proposed assessment is <br />attributed in part to a fixed parcel fee, the gross building area, the parcel size and the street frontage for commercial <br />properties (including multi- family residential parcels) and net building area for single family residential uses <br />including residential condominiums. There is one Benefit Zone identified. <br />Assessment Formula Methodology <br />Step 1. Select "Basic Benefit Unit(s)" <br />CBD assessment formulas typically are based on street frontage, parcel size, building size and /or location, all of <br />which relate to the amount of special benefit conferred on a particular parcel and the proportionate assessment to be <br />paid. The formula may base assessments on a single factor or a combination of these factors. <br />Based on the specific needs and corresponding nature of the program activities to be funded by the Modified <br />Downtown Santa Ana CMD, it is the opinion of this Assessment Engineer that the assessment factors on which to <br />base assessment rates relate directly to the proportionate amount of building area, parcel size and street frontage. <br />Building area, parcel size, and street frontage are each targeted to generate approximately 30% of all revenues while <br />the fixed parcel fee is targeted to generate approximately 10 %. <br />For commercial uses, the interactive application of building area, parcel size and street frontage quantities are a <br />proven method of fairly and equitably spreading special benefit costs to these primary beneficiaries (commercial uses) <br />of CMD funded services, programs and improvements. Each of these factors directly relates to the degree of benefit <br />each parcel will receive from CMD funded activities. <br />11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.