My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORDOBA CORPORATION 3
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2020
>
CORDOBA CORPORATION 3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2015 2:44:21 PM
Creation date
9/14/2011 4:57:51 PM
Metadata
Fields
Template:
Contracts
Company Name
CORDOBA CORPORATION
Contract #
A-2011-193
Agency
PUBLIC WORKS
Council Approval Date
8/1/2011
Expiration Date
6/30/2012
Insurance Exp Date
1/20/2013
Destruction Year
2020
Notes
Amended by A-2011-193-01, -02, -03, -04
Document Relationships
CORDOBA CORPORATION 3A
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2020
CORDOBA CORPORATION 3B
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2020
CORDOBA CORPORATION 3C
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2019
CORDOBA CORPORATION 3D
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
until a firm is awarded the contract. Firms that are not selected shall have their cost proposals returned to <br />them unopened. <br />IV. SCOPE OF WORK <br />Task 1 - New Starts Templates and Application <br />A significant amount of work in support of the project has recently been prepared through the Conceptual <br />Engineering/Alternatives Analysis/Draft Environmental Analysis effort. At project kick-off, City of Santa <br />Ana staff will provide the selected Consultant with copies of the documents that provide information <br />relevant to the Pre -PE scope of work. For efficiency and consistency, Consultant shall draw from those <br />materials to the maximum extent feasible to prepare and assemble all documents and data needed for an <br />FTA Section 5309 (New Starts/Small Starts/Urban Circulator) application, including: <br />A. Project Description <br />B. Standard Cost Categories (SCC) Annualized Cost Worksheets <br />C. Land Use Supporting Information <br />D. Project Financial Plan & Supporting Information <br />E. "Making the Case" Document <br />Task 1 Deliverables: <br />1. One electronic version (on CD in Microsoft Office Word 2007 or Microsoft Office Excel 2007 <br />format) and 12 hard copies of the draft Project Description, SCC Annualized Cost <br />Worksheets, Land Use Supporting Information, Project Financial Plan & Supporting <br />Information, and "Making the Case" Document <br />2. One electronic version (on CD in Microsoft Office Word 2007 or Microsoft Office Excel 2007 <br />format) and 12 hard copies of the final Project Description, SCC Annualized Cost <br />Worksheets, Land Use Supporting Information, Project Financial Plan & Supporting <br />Information, and "Making the Case" Document <br />Task 2 - Project Management Plan (PMP) <br />As a condition of Federal assistance, a grant applicant for a major capital investment project must <br />prepare a Project Management Plan (PMP) consistent with 49 USC 5327 (Project Management <br />Oversight) and 49 CFR 633 (Project Management Oversight Rule). The grant applicant must submit the <br />PMP in time for FTA to review the applicant's plan in conjunction with its New Starts/Small Starts grant <br />application. The PMP is a dynamic document for managing engineering, design, construction and start- <br />up of a project. The PMP must provide sufficient detail to demonstrate the grant applicant's technical <br />capability to carry out the project. <br />Consultant shall develop a draft PMP that addresses the following items: <br />A. Adequate recipient staff organization with well-defined reporting relationships, statements of <br />functional responsibilities, job descriptions, and job qualifications; <br />B. Budget that covers the project management organization, appropriate consultants, property <br />acquisition, utility relocation, systems demonstrations staff, audits, and miscellaneous payments <br />the recipient may be prepared to justify; <br />C. Construction schedule for the project: <br />D. Document control procedure and recordkeeping system <br />E. Change order procedure that includes a documented, systematic approach to handling of <br />construction change orders; <br />F. Organizations structures, management skills, and staffing levels required throughout the <br />construction phase; <br />G. Quality control and quality assurance functions, procedures, and responsibilities for construction, <br />system installation, and integration of system components; <br />H. Material testing policies and procedures; <br />I. Internal plan implementation and reporting requirements; <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.