My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORDOBA CORPORATION 3
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2020
>
CORDOBA CORPORATION 3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2015 2:44:21 PM
Creation date
9/14/2011 4:57:51 PM
Metadata
Fields
Template:
Contracts
Company Name
CORDOBA CORPORATION
Contract #
A-2011-193
Agency
PUBLIC WORKS
Council Approval Date
8/1/2011
Expiration Date
6/30/2012
Insurance Exp Date
1/20/2013
Destruction Year
2020
Notes
Amended by A-2011-193-01, -02, -03, -04
Document Relationships
CORDOBA CORPORATION 3A
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2020
CORDOBA CORPORATION 3B
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2020
CORDOBA CORPORATION 3C
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2019
CORDOBA CORPORATION 3D
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B. Tong, B. Post, 0. Jaff <br />One electronic and 12 hard copies of the draft FMP <br />Task 5 - Quality Management Plan (QMP) <br />Cordoba will produce the QMP for the implementation of the Project with assistance from URS. Appropriate levels of <br />reporting, documentation and accountability will be outlined that ensure compliance with FTA's 2002 guidelines. <br />S, Cuevas, B. Post <br />One electronic and 12 hard copies of the draft and the final QMP <br />Task 6 - Real Estate Acquisition Management Plan (RAMP) <br />The land use and zoning for Santa Ana -Garden Grove supports the development of higher density mixed use <br />development that can be served with a fixed guideway transit. Cordoba will lead the preparation of this document <br />with support from SOJ and URS Engineering. This locally -led team understands very well the local real estate along <br />the alternative routes and their use / characteristics, and the rights-of-way, facilities / improvements, ownership, <br />leases and politics related to major land tracts affected. The full documentation of local plans and commitments will <br />be included, all in full compliance with 49 CFR Part 24. The transit route does serve important attractions in Santa <br />Ana, supports transit oriented development for the future and connects to the multi -modal transit center. <br />B. Tong, D. Davies, D. Levinsohn 11 One electronic and 12 hard copies of the draft and the final RAMP <br />Tasks 7 and 8: Ridership Forecasting/Reporting <br />As noted in the Approach, the Cost Effectiveness criterion represents 33% of the federal rating for the project. Cost <br />effectiveness is determined by comparing the total cost of the project to the total benefits generated from the project. <br />The result of the comparison is an estimated cost per benefit. A cost per benefit below $24.99 results in a medium <br />rating. Costs higher than that result in a low rating. Portland ($29.42) and Tucson ($36 approximately) both received <br />low ratings. <br />Project benefits are substantially determined from information provided by travel demand forecasting models. The <br />required information is developed by applying the FTA SUMMIT software to the travel forecast results. Fixed <br />guideway projects are judged against a baseline case of improved bus transit. Current FTA methodology does not <br />account for the benefits of streetcar. The methodology is based substantially on travel time savings. Streetcar does <br />not generate travel time savings over a bus operating on the same street system. <br />The ridership forecasting effort and subsequent FTA SUMMIT analysis require careful management and policy <br />direction to obtain the desired outcomes while maintaining cost control given the budget allocation for this phase,. <br />The cost for conducting these elements of work iteratively can easily dominate the budget and could require more <br />funding than is allocated. In recognition that the prospect for obtaining a medium rating is very low, it needs to be <br />determined, in consultation with FTA, how extensive these efforts should be if the Cost Effectiveness category rating <br />for the project will not change substantially. <br />Section Three — Work Plan 33 <br />
The URL can be used to link to this page
Your browser does not support the video tag.