My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ORANGE, COUNTY OF (2) - 2011
Clerk
>
Contracts / Agreements
>
O
>
ORANGE, COUNTY OF (2) - 2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 2:28:39 PM
Creation date
9/15/2011 1:50:57 PM
Metadata
Fields
Template:
Contracts
Company Name
ORANGE, COUNTY OF
Contract #
N-2011-106
Agency
FINANCE & MANAGEMENT SERVICES
Destruction Year
0
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OC Waste & Recycling <br />MA-299-12010448 <br />City of Santa Ana <br />• Brake Inspection, Replacement and Modifications (including ABS systems) <br />• Wheel Bearing Repacking and Replacement <br />• Tire Rotation, Balancing, Repair and Replacement, including Wheel Alignment <br />• Air-conditioning Service <br />• Air and Fuel Filter Service and Replacement <br />• Cooling System and Radiator Service <br />• Belt and Hose Inspection and Replacement <br />• Transmission Service and Replacement (to include 4x2 and 4x4 vehicles transfer case for 4x4) <br />• Muffler/Exhaust System Repair and Replacement <br />• Differential Service <br />• Battery and Wiper Blade Replacement <br />• Smog Inspection and Certificate <br />• Body Work/Upholstery Repair and Replacement <br />• Broken Window Repair and Replacement, including Window and Related Hardware <br />• Safety Inspection <br />• Engine Replacement and Overhaul <br />• Vehicle Suspension Repair, Replacement or Modification, including Shock Absorber Replacement <br />• Under-chassis Modification <br />• Electrical System Trouble Shoot, Repair and Replacement <br />• Lighting Repairs and Replacement, including Headlights and Lenses <br />• Seat Belt Repair and Replacement <br />• Repair, Replacement, Maintenance, Installation and Modification to Auxiliary Equipment on some <br />Vehicles (to include but not limited to: bed cabinet/tool box; generator with built-in/separate gas tank; <br />water tank; lift gate; front-end vehicle winch; steel cabinets; hydraulic boom; hydraulic pump system; <br />diesel fueled steamer; steamer hose reel and gun; boom mounted cable winch and hose reel; water pump; <br />electrical converter; stainless steel purged/de-ionized water tanks; hydraulic transfer/discharge pump, <br />pump wire connectors and valves; hose extensions and connectors; equipment electrical system and <br />control board; boom/winch/hose reel controller and control box; etc.) <br />2. Towing Services: Contractor shall provide towing services at the cost provided in Attachment C, Contractor <br />Rates/Compensation. <br />C. Performance Requirements <br />In addition to the Service Requirements, Labor Requirements, Material/Fluid/Menu Costs, and all other terms and <br />conditions provided herein, Contractor shall satisfy the following performance requirements: <br />All work shall be performed in accordance with industry standard and code requirements. Attachment C, <br />Contractor Rates/Compensation, quotes shall be used as the basis for determining the labor, material, <br />fluid, and menu costs estimated for all services and maintenance functions performed. <br />Prior written justification from the Contractor shall be required by OC Waste & Recycling's Contract <br />Coordinator or designee (listed in Section III. below) for a total cost estimate provided by the Contractor. <br />OC Waste & Recycling staff will deliver vehicles to Contractor location unless towing is required or other <br />arrangements have been made with the Contractor. OC Waste & Recycling will subsequently pick up <br />vehicles upon completion of services. <br />2. Contractor shall provide an estimate of costs including labor and materials charges prior to the start of any <br />job. Contractor shall obtain written approval authorizing services by OC Waste & Recycling's Contract <br />Coordinator or designee. Failure to provide an estimate and to obtain written approval from OC Waste & <br />Recycling's Contract Coordinator or designee prior to commencing work, or exceeding the estimate <br />without written approval of the same may be grounds for denying payment. <br />Page 15 of 31
The URL can be used to link to this page
Your browser does not support the video tag.