My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IBI GROUP 5 (2) - 2011
Clerk
>
Contracts / Agreements
>
I
>
IBI GROUP 5 (2) - 2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2014 5:07:48 PM
Creation date
9/26/2011 10:32:51 AM
Metadata
Fields
Template:
Contracts
Company Name
IBI GROUP
Contract #
A-2011-198
Agency
Planning & Building
Council Approval Date
8/24/2011
Insurance Exp Date
4/30/2015
Destruction Year
0
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
available infrastructure data provided by City staff (e.g., traffic speeds, curb -to -curb <br />widths, etc.), and will take into account issues such as grades, directness of route, <br />barriers, and system connectivity. This network will include a variety of bikeways, <br />sidewalk improvement projects, and other bicycle /pedestrian capital improvement <br />projects (e.g., traffic calming, bicycle parking, etc.), The network will also incorporate <br />previously proposed and planned facilities. <br />The consultant team will develop a "Best Practices -- 4 E's" report identifying potential <br />changes to improve bicycle and pedestrian education, encouragement, enforcement, <br />evaluation, and public outreach efforts. These recommendations will be based both <br />on results of the previous tasks that identified problem areas plus experience gained <br />in other communities. <br />Recommendations and priority projects will be compiled into an Implementation Plan <br />based on the evaluation outcome combined with (a) funding availability and <br />requirements, (b) other programmed transportation improvements, (c) eliminating an <br />immediate bottleneck or safety hazard, and (d) ensuring that the system grows <br />rationally rather than as a series of disconnected pieces over time. The IBl team will <br />identify potential matching and major funding sources for these projects, and their <br />associated criteria and requirements. Costs of the phased improvements will be <br />compared with funding needs, so that long term programming for local matching funds <br />can be accomplished. <br />The Santa Ana Bicycle and Pedestrian Master Plan will include the review of existing <br />plans and legislation, existing conditions inventory and assessment, user needs <br />assessment, recommended walkway and bikeway network, project development and <br />prioritization, cost opinions, and implementation plan. <br />TASK 6: TRANSIT AND RAIL SERVICES <br />Objective: To incorporate planned rail and transit improvements, including the <br />Fixed Guideway, bus rapid transit, railroad quiet zones, and grade separation <br />projects into the Circulation Element and appropriately account for the benefits and <br />impacts of these projects on the mobility of residents within the city. <br />Key Issues: There are several related transit project planning and design efforts <br />underway within Santa Ana that together would dramatically increase travel choices and <br />i <br />
The URL can be used to link to this page
Your browser does not support the video tag.