Laserfiche WebLink
BENDER READY-MIX CONCRETE MANUFACTURING PROJECT <br />h Initial Study/Mitigated Negative Declaration <br />Mitigation Measures: No mitigation is required. <br />d) Create a new source of substantial light or glare which would adversely affect day or nighttime <br />views in the area? <br /> No Impact. <br /> Short-Term Impacts <br /> Short-term light and glare impacts are anticipated to be minimal, since no nighttime construction would <br /> be required for project implementation. Therefore, no impact would occur in this regard. <br /> Long-Term Impacts <br /> Security lighting currently exists at the Bender Ready-Mix facility. Light/glare also occurs as a result of <br /> existing vehicle headlights on roadways surrounding the site. Given the developed and industrialized <br /> nature of the project area, operations at the Bender Ready-Mix facility do not result in impacts that <br /> adversely affect nighttime views in the area. <br /> <br /> The proposed project would not result in any new lighting on-site. In addition, the project would not <br /> result in any expansion of long-term operations that would result in an increased number of vehicle trips <br /> to and from the site. Thus, impacts in this regard would not occur. <br /> Mitigation Measures: No mitigation is required. <br /> <br /> <br />a <br /> <br /> <br /> <br /> <br /> <br />JULY 2011 4.1-3 AESTHETICS <br />31A-35