My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
31A - CUP - 516 S SANTA FE ST
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
11/07/2011
>
31A - CUP - 516 S SANTA FE ST
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:38:33 PM
Creation date
11/3/2011 1:00:25 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
31A
Date
11/7/2011
Destruction Year
2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_a" BENDER READY-MIX CONCRETE MANUFACTURING PROJECT <br />Initial Study/Mitigated Negative Declaration , <br />The proposed project proposes minor aesthetic, drainage, water quality, and safety improvements at an ' <br />existing heavy industrial facility. Implementation of these improvements would not involve the routine <br />transport, use, or disposal of substantial quantities of hazardous materials. The improvements ' <br />associated with the project would not affect the existing operations of the Bender Ready-Mix facility or <br />alter conditions related to the transport, use, or disposal of hazardous materials. <br />With the exception of utilizing gasoline and diesel fuels for construction equipment, no other hazardous ' <br />materials would be transported to or from the project site, or used in the construction process. Fuels <br />and solvents for construction would be stored and utilized pursuant to existing regulatory requirements. <br />Therefore, impacts would be less than significant in this regard. ' <br />Mitigation Measures: No mitigation is required. <br />b) Create a significant hazard to the public or the environment through reasonably foreseeable ' <br />upset and accident conditions involving the release of hazardous materials into the <br />environment? ' <br />Less Than Significant Impact <br />Short-Term Impacts ' <br />During the short-term period of project construction, there is a possibility of accidental release of ' <br />hazardous substances such as petroleum-based fuels or hydraulic fluid used for construction <br />equipment. The level of risk associated with the accidental release of hazardous substances is not <br />considered significant due to the small volume and low concentration of hazardous materials utilized <br />during construction. The construction contractor would be required to use standard construction ' <br />controls and safety procedures that would avoid and minimize the potential for accidental release of <br />such substances into the environment. Standard construction practices would be observed such that <br />any materials released are appropriately contained and remediated as required by local, State, and ' <br />Federal law. <br />The proposed project would involve a minor amount of grading and excavation required primarily for ' <br />drainage and water quality improvements. No structures would be demolished as part of the proposed <br />project, thus minimizing the potential for encountering asbestos-containing materials or lead-based <br />paints. Construction activities associated with the project are not of the scope or nature to result in a ' <br />significant impact related to foreseeable upset or accident related to hazardous materials. <br />Long-Term Operational Impacts <br />Refer to Response 4.8(a), above, for a description of impacts related to existing and proposed <br />operations at the site. Impacts in this regard would be less than significant. <br />Mitigation Measures: No mitigation is required. <br />C) Emit hazardous emissions or handle hazardous or acutely hazardous materials, substances, or ' <br />waste within one-quarter mile of an existing or proposed school? <br />Less Than Significant Impact Three schools exist within one-quarter mile of the project site: 1) ' <br />Adeline C Walker Elementary School (approximately 0.15-mile west); 2) Roosevelt Elementary School <br />(approximately 0.25-mile west); and 3) Raymond A. Villa Fundamental Intermediate School <br />(approximately 0.25-mile northeast). As stated above, construction activities associated with the project ' <br />are not expected to be significant upon adherence to existing local, State, and Federal requirements <br />JULY 2011 4.8-2 HAZARDS AND HAZARDOUS MATERIALS ' <br />31A-62
The URL can be used to link to this page
Your browser does not support the video tag.