Laserfiche WebLink
' BENDER READY-MIX CONCRETE MANUFACTURING PROJECT <br />Initial Study/Mitigated Negative Declaration <br />' No enclosed bodies of water exist in proximity to the project site. The nearest semi-enclosed body of <br />water near the site is the Santa Ana River, located approximately three miles to the west. Given the <br />' distance of the project site from the Santa Ana River and any other enclosed or semi-enclosed bodies <br />of water, impacts related to seiches would be less than significant. <br />t The project site is located approximately 10 miles inland from the Pacific Ocean. Given its distance <br />from the coast and intervening topography and features, the risk of inundation due to tsunami is also <br />considered less than significant. <br />As discussed within Response 4.6(a)(4), the proposed project site and surrounding areas are fully <br />developed and topography is generally flat. There are no landforms within the vicinity capable of <br />producing mudflow. Thus, no impacts would occur in this regard. <br />Mitigation Measures: No mitigation is required. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />r <br />' JULY 2011 4.9-5 HYDROLOGY AND WATER QUALITY <br />31A-69