My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
31A - CUP - 516 S SANTA FE ST
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
11/07/2011
>
31A - CUP - 516 S SANTA FE ST
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:38:33 PM
Creation date
11/3/2011 1:00:25 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
31A
Date
11/7/2011
Destruction Year
2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
•, j ': <br />BENDER READY-MIX CONCRETE MANUFACTURING PROJECT <br />Initial Study/Mitigated Negative Declaration <br />3) Schools? <br />Less Than Significant Impact The existing Bender Ready-Mix facility generates approximately 12 <br /> <br />full-time staff. Proposed improvements associated with the project would not result in any expansion of , <br />long-term operations or requirements for additional staff. Given the limited number of employees <br />generated by the facility, it is not expected that the project would result in a population increase that <br />would significantly impact schools in the.project area. Thus, impacts would be less than significant in <br />this regard. <br />Mitigation Measures: No mitigation is required. <br />4) Parks? <br />L <br />Th <br />ess <br />an Significant Impact. The City operates a range of parks within the City. The nearest park <br />to the project site is Prentice Park, located along South Elk Lane, approximately 0.60 miles east of the <br />project site. As stated above, the existing facility generates approximately 12 full-time jobs, and <br />proposed improvements would not result in any increase in employment. Given the limited number of <br />employees generated by the facility, it is not expected that the project would result in a population <br />increase that would significantly impact parks in the project area. Impacts in regards to parks and other <br />recreational facilities would be less than significant. <br />Mitigation Measures: No mitigation is required. <br />5) Other public facilities? <br />No Impact. As shown above in Responses 4.14(a)(1) through 4.14(a)(4), the proposed project would , <br />not result in significant impacts on public services or facilities. No other public facilities are anticipated <br />to be affected by the project. No impacts would occur in this regard. <br />i <br />M <br />tigation Measures: No mitigation is required. <br /> <br /> <br />ii <br /> <br /> <br /> <br />JULY 2011 4.14-2 PUBLIC SERVICES <br />31A-86
The URL can be used to link to this page
Your browser does not support the video tag.