Laserfiche WebLink
BENDER READY-MIX CONCRETE MANUFACTURING PROJECT <br />Initial Study/Mitigated Negative Declaration <br />1 4.15 RECREATION <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> Less,Than `. <br />Would the project: Potentially. Significant Less Than <br /> Significant Impact With Significant Impact <br /> Impact Mitigation Impact <br /> Incorporated <br />a. Would the project increase the use of existing neighborhood <br />and regional parks or other recreational facilities such that ? <br />substantial physical deterioration of the facility would occur or <br />be accelerated? <br />b. Does the project include recreational facilities or require the <br />construction or expansion of recreational facilities which ? <br />mi ht have an adverse physical effect on the environment? <br />a) Would the project increase the use of existing neighborhood and regional parks or other <br />recreational facilities such that substantial physical deterioration of the facility would occur or <br />be accelerated? <br />Less Than Significant Impact. As stated in Response 4.14(a)(4), the proposed project would not <br />result in an increase in demand on parks or other recreational facilities, and would not result physical <br />deterioration of these facilities. Impacts would be less than significant. <br />Mitigation Measures: No mitigation is required. <br />b) Does the project include recreational facilities or require the construction or expansion of <br />recreational facilities which might have an adverse physical effect on the environment? <br />Less Than Significant Impact As stated in Response 4.14(a)(4), the proposed project would not <br />result in an increase in demand on parks or other recreational facilities, and would not result in an <br />adverse physical effect on the environment. Impacts would be less than significant. <br />' Mitigation Measures: No mitigation is required. <br /> <br /> <br /> <br />e <br /> <br />JULY 2011 4.15-1 RECREATION <br />31A-87