Laserfiche WebLink
BENDER READY-MIX CONCRETE MANUFACTURING PROJECT <br />Initial Study/Mitigated Negative Declaration <br />closure/rerouting signage during the brief period when repaving activities occur. Thus, impacts in this <br />regard would be less than significant. <br />Mitigation Measures: No mitigation is required. <br />t) Conflict with adopted policies, plans, or programs regarding public transit, bicycle, or <br />pedestrian facilities, or otherwise decrease the performance or safety of such facilities? <br />No Impact As stated above in Response 4.16(a), the existing facility occurs within a heavy industrial <br />area. The existing facility does not currently conflict with any policies, plans, or programs related to <br />public or altemative transportation. Improvements associated with the project would not alter or expand <br />existing operations at the site. The facility does not include any components that would conflict with <br />adopted policies, plans, or programs regarding public transit, bicycle, or pedestrian facilities, and it <br />would not otherwise decrease the performance or safety of such facilities. Thus, no impacts would <br />occur. <br />Mitigation Measures: No mitigation is required. <br /> <br /> <br /> <br /> <br />1? <br /> <br /> <br /> <br /> <br /> <br /> <br />I JULY 2011 <br />4.16-3 <br />TRANSPORTATION/TRAFFIC <br />31A-91