Laserfiche WebLink
PROJECT HISTORY & SUMMARY <br />History: <br />■ Project is part of mitigation for Tustin Legacy Project, City of Tustin, <br />approved in 2003 <br />- Redevelopment of the former Tustin Marine Corps Air Station <br />with mixed -use commercial, residential, and industrial <br />- Traffic impact mitigation measure provides funds for design <br />and environmental processing <br />■ This segment is currently a bottleneck - both sides of this segment <br />are already 6 lanes <br />■ Preliminary engineering and environmental work was initiated in <br />2009 <br />Summary: <br />■ Widening is needed to address growth trends and congested traffic <br />■ Proposed widening is from 4 lanes to 6 lanes between Grand <br />Avenue and Main Street <br />■ Project is consistent with County Master Plan of Highways (MPAH) <br />■ Project is consistent with City's General Plan Circulation Element <br />EXISTING CONDITIONS <br />■ Existing residential and commercial /industrial uses <br />■ Four lanes (2 lanes in each direction) <br />■ Signals at: <br />- Main St. <br />- Pacific Electric Bike Trail (Anahurst PI.) <br />- Halladay St. <br />- Standard Ave. <br />- Fire Station (Beeson Ln.) <br />- Grand Ave. <br />■ At -grade railroad crossing between Standard Ave. and Hathaway <br />St. <br />■ Utilities (power poles /lines) <br />CITY COUNCIL MINUTES 11 OCTOBER 17, 2011 <br />1 0A -11 <br />