My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2011-10-17
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
11/07/2011
>
FULL PACKET_2011-10-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2016 4:29:40 PM
Creation date
11/3/2011 3:52:09 PM
Metadata
Fields
Template:
City Clerk
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
536
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT DESCRIPTION <br />■ Several alignment alternatives were evaluated to minimize impact <br />■ 3 alignments were analyzed, along with a no -build alternative <br />■ Increased right -of -way width will accommodate: <br />— 3 travel lanes in each direction <br />— Sidewalk <br />— Bike lane <br />— Raised center landscaped median <br />■ Improved drainage <br />■ Bioswales to accommodate new Clean Water Act requirements <br />TYPICAL CROSS - SECTION <br />PROJECT ALTERNATIVE — 1 <br />■ Widen the South Side of Warner 50 feet behind existing ROW <br />■ Major Impacts to: <br />— Monroe Elementary School <br />— National Guard Armory <br />— Delhi Park <br />— Cherry Aerospace Fastening <br />— Fire Station <br />PROJECT ALTERNATIVE — 2 <br />■ Widen both sides of Warner 25 feet behind existing ROW <br />■ Major Impacts to: <br />Cherry Aerospace Fastening <br />Fire Station <br />■ Minimal Impacts to: <br />CITY COUNCIL MINUTES 12 OCTOBER 17, 2011 <br />1 0A -12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.