Laserfiche WebLink
BENDER READY -MIX CONCRETE MANUFACTURING PROJECT <br />Initial Study /Mitigated Negative Declaration <br />individual responses vary considerably. Standards usually address the needs of the majority of the <br />general population. <br />SHORT -TERM NOISE IMPACTS <br />Construction of the proposed project would occur over approximately three months. Construction <br />activities would include minor demolition, grading, trenching, paving, and building construction. <br />Ground -bome noise and other types of construction- related noise impacts would typically occur during <br />the initial site preparation. This phase of construction has the potential to create the highest levels of <br />noise; however, it is generally the shortest of all construction phases. Typical noise levels generated by <br />construction equipment are shown in Table 4.124, Maximum Noise Levels Generated by Construction <br />Equipment. Operating cycles for these types of construction equipment may involve one or two <br />minutes of full power operation followed by three to four minutes at lower power settings. Other primary <br />sources of acoustical disturbance would be due to random incidents, which would last less than one <br />minute (such as dropping large pieces of equipment or the hydraulic movement of machinery lifts). <br />Table 4.12 -4 <br />Maximum Noise Levels Generated by Construction Equipment <br />Concrete Saw <br />20 <br />90 <br />Concrete Mixer Truck <br />40 <br />79 <br />Backhoe <br />40 <br />78 <br />Dozer <br />40 <br />82 <br />Excavator <br />40 <br />81 <br />Forklift <br />40 <br />78 <br />Paver <br />50 <br />77 <br />Roller <br />20 <br />80 <br />Tractor <br />40 <br />84 <br />Water Truck <br />40 <br />80 <br />Grader <br />40 <br />85 <br />General Industrial Equipment <br />50 <br />85 <br />Note: <br />1 — Acoustical Use Factor (percent): Estimates the fraction of time each piece of construction <br />equipment is operatinq at full power i.e., its loudest condition during a construction operation, <br />Source: Federal Highway Administration, Roadway Construction Noise Model (FHWA- HEP -05- <br />054 ), January 2006. <br />Chapter 10.28.040 of the City's Municipal Code states that construction activities are permitted during <br />the hours of 7:00 AM and 8:00 PM on weekdays and Saturdays, and are not permitted on Sundays or <br />Federal holidays. The City does not have noise limits during the allowed construction hours. As such, <br />the Speech Interference Criteria is used to evaluate construction noise levels. For construction noise, a <br />"substantial" noise increase can be defined as interference with activities during the day and night. One <br />indicator that construction noise could interfere with daytime activities would be speech interference. <br />As the City does not have quantitative guidelines for construction noise, the following criteria is utilized <br />in the analysis to define relative construction - related noise impacts: <br />Speech Interference Criteria. Speech Interference Level was designed as a simplified <br />substitute for the Articulation Index.' It was originally defined as the average of the now <br />I Articulation index takes into account that some frequencies are more effective in masking speech than others. The frequency <br />range from 250 to 7000 Hz is divided into 20 bands. The difference between file average speech peak level in each of these <br />bands is calculated and the resulting numbers combined to give a single index. <br />JULY 2011 <br />4.12 -4 <br />lki <br />L_i <br />11' <br />Ll <br />NOISE I <br />