Laserfiche WebLink
BENDER READY -MIX CONCRETE MANUFACTURING PROJECT <br />Initial Study /Mitigated Negative Declaration <br />3) Schools? <br />Less Than Significant Impact The existing Bender Ready -Mix facility generates approximately 12 <br />full -time staff. Proposed improvements associated with the project would not result in any expansion of <br />, <br />long -term operations or requirements for additional staff. Given the limited number of employees <br />generated by the facility, it is not expected that the project would result in a population increase that <br />would significantly impact schools in the.project area. Thus, impacts would be less than significant in <br />this regard. <br />Mitigation Measures: No mitigation is required. <br />4) Parks? <br />Less Than Significant Impact. The City operates a range of parks within the City. The nearest park <br />to the project site is Prentice Park, located along South Elk Lane, approximately 0.60 miles east of the <br />project site. As stated above, the existing facility generates approximately 12 full -time jobs, and <br />proposed improvements would not result in any increase in employment. Given the limited number of <br />employees generated by the facility, it is not expected that the project would result in a population <br />increase that would significantly impact parks in the project area. Impacts in regards to parks and other <br />recreational facilities would be less than significant. <br />Mitigation Measures: No mitigation is required. <br />5) Other public facilities? <br />No Impact. As shown above in Responses 4.14(a)(1) through 4.14(a)(4), the proposed project would <br />, <br />not result in significant impacts on public services or facilities. No other public facilities are anticipated <br />to be affected by the project. No impacts would occur in this regard. <br />Mitigation Measures: No mitigation is required. <br />ii <br />JULY 2011 4.14 -2 PUBLIC SERVICES <br />31A-86 <br />