Laserfiche WebLink
BENDER READY -MIX CONCRETE MANUFACTURING PROJECT <br />Initial Study /Mitigated Negative Declaration <br />4.15 RECREATION <br />Less, Than <br />Would the protect: Potentially Significant Less Than <br />Significant Impact With Significant Impact <br />Impact Mitigation Impact <br />Incorporated <br />a. Would the project increase the use of existing neighborhood <br />and regional parks or other recreational facilities such that ✓ <br />substantial physical deterioration of the facility would occur or <br />be accelerated? <br />b. Does the project include recreational facilities or require the <br />construction or expansion of recreational facilities which ✓ <br />mi ht have an adverse physical effect on the environment? <br />a) Would the project increase the use of existing neighborhood and regional parks or other <br />recreational facilities such that substantial physical deterioration of the facility would occur or <br />be accelerated? <br />Less Than Sipnifrcant Impact. As stated in Response 4.14(a)(4), the proposed project would not <br />result in an increase in demand on parks or other recreational facilities, and would not result physical <br />deterioration of these facilities. Impacts would be less than significant. <br />Mitigation Measures: No mitigation is required. <br />b) Does the project include recreational facilities or require the construction or expansion of <br />recreational facilities which might have an adverse physical effect on the environment? <br />Less Than Significant Impact As stated in Response 4.14(a)(4), the proposed project would not <br />result in an increase in demand on parks or other recreational facilities, and would not result in an <br />adverse physical effect on the environment. Impacts would be less than significant. <br />'Mitigation Measures: No mitigation is required. <br />e <br />JULY 2011 4.15 -1 RECREATION <br />31A-87 <br />