My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25D - AGMT - PRELIM ENGINEERING
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
11/28/2011
>
25D - AGMT - PRELIM ENGINEERING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:37:32 PM
Creation date
11/23/2011 4:39:14 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25D
Date
11/28/2011
Destruction Year
2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COOPERATIVE AGREEMENT NO. C-1-3099 <br />1 D. Upon FTA approval to enter into PE, under the direction of the AUTHORITY, CITY <br />z shall be responsible for completing activities defined by FTA in EXHIBIT I "NEW STARTS <br />3 PROJECT PLANNING AND DEVELOPMENT CHECKLIST OF PROJECT SPONSOR <br />a SUBMITTALS TO FTA TO ENTER FINAL DESIGN (FD)", attached hereto and incorporated by <br />s reference, before requesting entry into Final Design (FD). <br />6 E. Preliminary Engineering is defined by the Federal Transit Administration as <br />7 completion of 30-50% of the design drawings and specifications. At the conclusion of PE, as required <br />8 by the Federal Transit Administration, under the direction of the AUTHORITY, CITY shall complete all <br />9 documentation including, but not limited to documentation that defines any required right-of-way <br />10 acquisition, utility relocation, third party agreements and the preparation of final construction plans <br />11 (including construction management plans), detailed specifications, construction cost estimates, and bid <br />12 documents. Under the direction of the AUTHORITY, CITY shall prepare the PROJECT's final financial <br />13 plan. CITY shall collect and analyze data needed to prepare the Before and After Study. Specifically, <br />14 the PE package shall include, but is not limited to: <br />15 1. Final Environmental Documentation <br />16 2. Vehicle fleet procurement strategy <br />17 3. 30% design completion including: <br />18 a. Complete alignment drawings <br />19 b. Complete station location drawings <br />20 c. 30% systems drawings including location of traction power substations <br />21 d. Major utility relocation mitigation plan <br />22 e. Real Estate parcel definition, Operations and Maintenance Facility <br />23 F. CITY shall conduct all procurement related activities for the PROJECT pursuant to <br />24 CITY's procurement policies and procedures and FTA requirements. If there is a conflict between <br />25 the CITY's procedures and the FTA procedures, the FTA procedures control. <br />26 G. CITY shall submit to AUTHORITY for review, comment and approval by the Chief <br />Page 7 of 17 <br />25D-10