My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
STREET LIGHT RESTORATION SPECIALISTS, INC.
Clerk
>
Contracts / Agreements
>
INACTIVE CONTRACTS (Originals Destroyed)
>
S (INACTIVE)
>
STREET LIGHT RESTORATION SPECIALISTS, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2024 2:34:54 PM
Creation date
12/2/2011 10:49:00 AM
Metadata
Fields
Template:
Contracts
Company Name
STREET LIGHT RESTORATION SPECIALISTS, INC.
Contract #
A-2011-204
Agency
PUBLIC WORKS
Council Approval Date
8/24/2011
Destruction Year
2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SPECIFICATIONS <br />PART 1 - GENERAL <br />1.01 WORK INCLUDED <br />The work includes furnishing of materials and equipment, preparation of surfaces and completion of the <br />painting and finishing of all surfaces as specified herein. <br />1.02 RELATED WORK <br />A. Surfaces not to be painted: <br />1. Pre -finished luminaire fixtures. <br />2. Banners and banner mounting poles. <br />3. Surfaces specifically scheduled or noted not to be painted. <br />1.03 SUBMITTALS <br />A. Product data: <br />1. Not less than thirty (30) days before beginning work, submit a complete list of materials proposed for <br />use, together with manufacturer's specifications. <br />2. Paint materials and products shall be subject to the Agency's approval. <br />B. Color samples: <br />1. Prepare all color and finishes on samples of similar substrate, 6" x 6" in size. <br />2. Samples shall be submitted as requested until required sheen, color and texture is achieved. <br />3. Label and identify each sample as to location and application. <br />1.04 DELIVERY STORAGE AND HANDLING <br />A. Deliver paint materials in sealed original labeled containers bearing manufacturer's name, type of <br />paint, stock number, color and instructions for reducing or mixing where applicable. <br />B. Paint materials and equipment. <br />1. No materials may be stored on site. <br />2. Comply with health and fire regulations. <br />1.05 PROJECT CONDITIONS <br />A. Comply with manufacturer's recommendations as to environmental conditions under which <br />coatings and coating systems can be applied. Do not apply paint when temperature is below 45 degrees F <br />Do not apply exterior paint in damp or rainy weather; ensure that the surface has dried thoroughly before <br />proceeding. <br />B. Do not apply finish in areas where dust is being generated. <br />
The URL can be used to link to this page
Your browser does not support the video tag.