Laserfiche WebLink
AGREEMENT C-1-3023 <br />PROJECT P -WARNER AVENUE -WORK BY LOCATION <br />ATTACHMENT A <br />Comments, Wishes, Needs of Santa Ana <br />Instructions: Enter any special circumstance such as conduit, communications, central or <br />field master modifications, new systems, TMC, YIDS, etc. that are not part of the intersection <br />listing on the Main Data Sheet. Prioritize with 1 being best and 5 being worst. Add items if <br />you wish. <br />Priority Description Comments <br />1 es, ee-TP on Warner/Wright Street <br />2 ee-TP on Wamer/Pullman <br />3 Install conduit and interconnect/fiber from traffic <br />signal cabinet to splice kit (Warner @ Standard) <br /> <br />4 Install conduit and interconnect/fiber from Grand to <br />Wright and install communication equipment for IP <br />communication <br />5 Replace existing cabinet with new Type 332 Traffic <br />Signal Cabinet at Main. <br />6 Replace existing cabinet with new Type 332 Traffic <br />Signal Cabinet at Flower. <br />7 Install conduit and interconnect.fiber from Raitt to <br />Bristol <br /> <br /> <br /> <br /> <br />25B-50