My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2011-12-19
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
12/19/2011
>
FULL PACKET_2011-12-19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:36:06 PM
Creation date
12/16/2011 3:59:16 PM
Metadata
Fields
Template:
City Clerk
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
502
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br /> <br /> The Academy Charter High School MND I City of Santa Ana Planning Division <br /> <br /> • 2035 Project Design Year No-Project Conditions <br /> 2035 Project Design Year with Project Conditions <br /> Year 2013 volumes will be identified by applying an appropriate growth rate identified by the City to the existing <br /> volumes and adding traffic from approved/pending projects in the area that are anticipated to be completed prior <br /> to the opening of the proposed project. Year 2035 forecasts will be developed using a local or regional travel <br /> demand model, City General Plan forecasts, or application of a growth rate combined with trips from approved <br /> and pending projects. This includes preparation of a cumulative traffic analysis that utilizes all of the previous, <br /> pending or reasonably foreseeable projects within the traffic study area. <br /> In addition, a review of relevant traffic and parking studies and documents containing traffic analyses within the <br /> project area will be completed. This will be performed to determine of any future improvements are to be <br /> assumed. In addition, this will include evaluation of the mitigation measures presented in the original <br /> development agreement/traffic study as it relates to any proposed mitigation recommended in the proposed <br /> project's traffic study. <br /> » Traffic Impacts and Mitigations. Fehr & Peers will identify impacts associated with the project traffic. If any <br /> impacts are identified, mitigations will be noted. These mitigations could include traffic signal installation, <br /> traffic signal improvements, intersection lane striping, localized street improvements, roadway widening, or <br /> other related items. Intersection control analysis at unsignalized intersections will be performed, including <br /> performing a peak hour signal warrant analysis at unsignalized locations to determine of a traffic signal is <br /> warranted and required. <br /> ® Site Plan and Alternative Modes Review. Fehr & Peers will conduct a review of the project site plan <br /> related to site access, internal circulation, and parking. Assessments and recommendations will be <br /> developed at project access locations including sight distance and stopping sight distance based on <br /> information collected in previous tasks. Internal circulation, Including vehicle queues at driveways and <br /> potential impacts of drop-offs and pick-ups on street traffic, will be analyzed using the information collected <br /> in Task 2. We will also conduct a peer review of the LLG parking study prepared for the site to determine if <br /> adequate parking will be provided for the project. Concurrent with this site plan review, Fehr & Peers will <br /> also determine if there are any conflicts with adopted programs and policies related to alternative travel <br /> modes like bicycles, pedestrians, and transit. <br /> ® Neighborhood Impacts. A detailed assessment of the potential impacts to the adjacent residential areas <br /> will be performed. This scope assumes that neighborhood streets will be assessed using the count <br /> information provided or collected in previous tasks. Please note that this scope and fee assumes this <br /> assessment will be conducted in a methodology that is similar in effort to a TIRE (Traffic Intrusion on <br /> Residential Environments) index. <br /> ® Draft Report. Fehr & Peers would produce a professional traffic engineering draft traffic impact report. It is <br /> anticipated that a draft report would be produced, with the report updated following the receipt of any <br /> comments from the project team and City staff. <br /> Sewer Capacity Analysis <br /> As a subconsultant to ICF, Fuscoe will prepare a project-specific sewer capacity analysis as requested by the <br /> RFP. To identify and document the existing conditions on the project site, Fuscoe will conduct a review of <br /> available information related to the project site, including previous wastewater generation demands from the <br /> site, proposed development plans, the City's Sewer Master Plan, and any other information that may be <br /> pertinent to the existing or proposed wastewater demand. <br /> Fuscoe will then prepare a sewer capacity analysis for the proposed project that would evaluate the existing <br /> demand based on local sewer generation factors and compare it with proposed demand based on the new <br /> school use and projected sewer generation factors. The study will also evaluate the capacity of the public sewer <br /> system in the adjacent right-of-way by comparing proposed project flows with the estimated flows (i.e. modeled <br /> Page 15 <br /> 25A-27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.