Laserfiche WebLink
<br /> <br /> <br /> <br /> <br /> The Academy Charter High School MND I City of Santa Ana Planning Division <br /> <br /> flows) of the public sewer system provided by the City's most recent Sewer Master Plan. If sewer flow <br /> monitoring data is available from City of Santa Ana Public Works Department, it will be incorporated into the <br /> analysis to assist with capacity assessment. This scope of work does not include evaluation of the existing <br /> sewer system to obtain current sewer flow monitoring data. <br /> The sewer capacity analysis will be summarized in the utilities section of the IS/MND. The report provided by <br /> Fuscoe will be included as an appendix to the IS/MND. <br /> <br /> Task 3. Prepare Administrative Draft IS/MND <br /> To utilize time most efficiently, preparation of the technical studies would occur concurrently with preparation of <br /> the administrative draft MND. ICF will prepare an administrative draft IS/MND for the project, which will include <br /> an evaluation of the environmental resources contained in the CEQA Environmental Checklist. The analyses will <br /> include: <br /> • Discussion of existing conditions <br /> • Identification, analysis, and evaluation of all potential environmental impacts <br /> Is Examination and recommendation of feasible ways to eliminate or minimize adverse environmental <br /> impacts <br /> a Discussion of cumulative impacts <br /> We will provide substantial evidence to support the findings in the CEQA Environmental Checklist, providing <br /> both quantitative and qualitative analysis. To support the conclusions of the analysis for some of the topic areas, <br /> we will use the technical studies and analyses described previously. <br /> The cumulative impacts analysis will focus on the potential for environmental impacts from this project, along <br /> with other proposed and reasonably foreseeable projects In the area. We will develop the list of cumulative <br /> projects in coordination with City staff, and reach out to surrounding jurisdictions (i.e., Garden Grove). We will <br /> evaluate and discuss the project's contribution to the overall cumulative baseline to identify any potential <br /> "cumulatively considerable" impacts. <br /> ICF will prepare a fully edited administrative draft IS/MND for the City's review and comment. Following the <br /> City's review of the administrative draft document, ICF will incorporate the City's comments, revise the <br /> document accordingly, and provide a draft document for City review prior to public distribution. <br /> Deliverables <br /> A Administrative draft IS/MND including all technical studies - 10 hard copies and one round of review is <br /> included in the budget <br /> • Screencheck draft IS/MND including all technical studies -10 hard copies and one round of review is <br /> included in the budget <br /> • Electronic files and CD of each draft <br /> <br /> Task 4. Prepare and Circulate Public Draft IS/MND, NOI, and NOC <br /> Upon the City's approval of the draft IS/MND, we will prepare and produce copies for public review. ICF will <br /> prepare a notice of intent (NOI) for posting at the County Clerk and a notice of completion (NOC) for submittal to <br /> the State Clearinghouse. ICF will circulate the IS/MND for a 30-day public review period. We will work In <br /> consultation with City staff to develop a distribution list for the IS/MND, we will distribute the document to state <br /> and local agencies, and other recipients for public review and comments, as determined by the City and we will <br /> post the NOI at the County Clerk's office. As is practice in working with the City, we assume that City staff will <br /> draft the notice for a newspaper of regional circulation. <br /> <br /> <br /> Page 16 <br /> <br /> 25A-28 <br />