Laserfiche WebLink
<br /> <br /> <br /> <br /> <br /> walls, planters, raised curbing, railing, exterior of buildings, overhead shelters, <br /> etc. <br /> <br /> (1) All picnic amenities (picnic tables, b.b.q.s, picnic shelters, concrete picnic <br /> pads, etc.) and park benches shall be wiped clean every day Monday <br /> through Sunday to assure that all trash, stains, spills, debris, glass, staples, <br /> nails, tape, wire, etc. is removed. <br /> <br /> (2) All picnic concrete paved areas and b.b.q.'s, park bench areas, patio areas, <br /> and areas adjacent building entrances shall be cleaned once a month using <br /> high pressure cleaning equipment. <br /> (3) All barbecues shall have ashes, charcoal or any other materials removed <br /> once a week. Contractor shall paint the exterior of the b.b.q.'s and the post <br /> with heat and rust resistant flat black paint whenever rust appears. <br /> <br /> e) All parks with flagpoles shall have an American flag displayed at all times. The <br /> Contractor shall visually inspect the flag every day to assure it is in good <br /> condition. Should, in the opinion of the Director, the flag not be in good <br /> condition (faded, discolored, torn and/or having holes) Contractor shall <br /> immediately request from the Director a new flag. Contractor shall raise the <br /> new flag immediately upon receipt from the Director. <br /> <br /> f) Drinking fountains shall be cleaned, sanitized and unplugged on a continuous <br /> basis. The Contractor shall use approved germicidal cleaner and products to <br /> assure that drinking fountains are clean and polished. The Contractor shall <br /> remove all mineral build up, algae, stains, etc. The Contractor shall achieve this <br /> level of quality using a combination of cleansers, metal polish product, hand <br /> and/or power tools. Should the drinking fountain be so plugged that dismantling <br /> the fountain is required the Contractor shall notify the Director immediately so <br /> City staff can make the repair. <br /> <br /> 9. Playground/Tot-Lot Areas <br /> <br /> a) The Contractor shall provide maintenance of all playground/tot-lot sand and <br /> rubberized areas once a week. Maintenance shall include, but not limited to, <br /> loosening of compacted areas, re-grading sand/wood chips areas to level <br /> condition (eliminating ruts, depressions, build up areas, etc.), sifting of <br /> sand/wood chips to assure that debris and any other foreign objects are <br /> removed, removal of weeds, removing sand/wood chips on sidewalks <br /> surrounding the playground/tot-lot, eliminating berms (including pre-existing) <br /> in the turf surrounding the playground/tot-lots (high pressure water blasting or <br /> sod cutting, leveling and re-sodding are approved methods), and trash and other <br /> undesirable material. Rubberized fall areas shall be cleaned of sand/wood chips <br /> and debris daily. Any sand/wood chips that accumulate on the rubberized <br /> surface shall be reused. Sand/wood chips and debris on the playground <br /> equipment shall be removed. <br /> <br /> <br /> <br /> 2514-36 <br />