My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25H - AGMT - MASTER LANDSCAPE
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2012
>
01/17/2012
>
25H - AGMT - MASTER LANDSCAPE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2012 10:27:42 AM
Creation date
1/12/2012 4:22:14 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Parks, Recreation, & Community Services
Item #
25H
Date
1/17/2012
Destruction Year
2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br /> <br /> b) The City shall be responsible for all playground equipment and tot-lot area <br /> safety inspections. <br /> <br /> 10. Ball Diamond Maintenance <br /> The Contractor shall retain a sub-contractor to provide ball diamond infield <br /> maintenance as set forth in Attachment 1. <br /> <br /> a) Baseball Perimeter Maintenance <br /> <br /> Ball diamond perimeter maintenance shall be performed daily. Ball diamond <br /> perimeter maintenance shall be defined as all areas outside the field of play and <br /> sideline/dugout areas where coaches, players and others associated with the <br /> game gather. Ball diamond perimeter maintenance areas shall include but is not <br /> limited to grandstands, areas around concession stands, fence lines, warm-up <br /> areas, etc. The work that shall be performed on a daily basis shall include <br /> picking up trash and debris, blowing off areas/hosing down areas using a high <br /> pressure nozzle to remove brick dust, stains and/or all other foreign material, <br /> such as sunflower seeds or peanut shells, so that all areas, including pavement <br /> and landscape areas, are 100% free and clean. <br /> <br /> b) Daily Outfield Maintenance <br /> <br /> (1) Irrigation checks and repairs to assure that irrigation heads are at the <br /> proper grade to avoid injury to players who may fall on them and that no <br /> "slippery" areas exist. <br /> <br /> (2) Fill in of divots and depressions and all uneven areas with #20 white silica <br /> sand, organic compost mixed with Stovers Bermuda Dunes grass seed <br /> during the spring/summer and Stover Grand Slam perennial rye grass seed <br /> during the fall winter to re-establish the areas. <br /> <br /> (3) Level fence line areas using a rock or leveling rake. <br /> <br /> (4) Level and drag warning track areas using nail drag followed by finishing <br /> drag mats. Contractor shall apply new brick dust to fence lines and <br /> warning tracks as necessary to maintain consistent 1/2" layer of brick dust <br /> in these areas. <br /> <br /> c) Weekly Maintenance <br /> <br /> (1) Contractor will then edge the fence lines and warning track to achieve <br /> crisp straight lines and a smooth crisp arc where the brickdust warning <br /> track meets the sport turf. <br /> <br /> d) Annual Maintenance <br /> <br /> (1) Top dress outfield turf using Santa Ana mix or approved product. Apply <br /> with an approved top dressing machine that will achieve a level playing <br /> <br /> 251-37 <br />
The URL can be used to link to this page
Your browser does not support the video tag.