Laserfiche WebLink
<br /> <br /> <br /> <br /> <br /> 5.3 Other Equipment <br /> <br /> 5.3.1 Hand Tamp: 20 lb. variety with 48" min. handle. Used to compact worn <br /> areas around bases, home plate and pitching mound. <br /> 5.3.2 Plastic Sheeting and Duct Tape: Used to wrap hand tamp head and help <br /> prevent wet clay from sticking. <br /> <br /> 5.3.3 Grade or Grooming Rake: Used to rake and fine level areas. Shall be <br /> made of aluminum, 36" wide and a 6' handle. <br /> <br /> 5.3.4 Heavy Duty Shovels: Used to move material. Round/Square Point and <br /> Scoop shovels. <br /> <br /> 5.3.5 Heavy Hose: Used to water down skinned area. Shall be 3/4" to <br /> 1" top quality construction with 225-psi working pressure. Leaks of any <br /> kind are not permitted. Contractor shall have a minimum of 175' of hose <br /> on hand at all times. <br /> <br /> 5.3.6 High Pressure Nozzle: Attached to hose. Use to spray down brickdust <br /> and push excess brickdust off turf edges. <br /> <br /> 5.3.7 Industrial Push Broom: Used to remove excess brickdust from turf <br /> edges. Shall be 24" min. wide with heavy-duty dual weight bristles. <br /> <br /> 5.4 Wet Conditions Equipment" (Add to equipment above) <br /> During periods of inclement weather or when the areas are wet the contractor shall have <br /> "on-hand" during all brickdust maintenance operations the following items: <br /> <br /> 5.4.1 Squeegee: Used to push/squeeze water off wet areas or into dry areas or <br /> drains. Shall be 24" to 36" wide with neoprene blade and <br /> magnesium/aluminum head. <br /> <br /> 5.4.2 "Super Sopper": Used to collect standing water in brickdust areas. Shall <br /> be drum type with exterior sponge and arm holding drum. <br /> <br /> 5.4.3 Diamond or Beckson Pump: Used to remove standing water in brickdust <br /> areas. Shall be plastic with flexible piston and value. <br /> <br /> 5.4.4 Infield Sopper with Wringer and Bucket: Used to collect standing water <br /> in brickdust areas. Sopper shall be geotextile-covered sponge typical for <br /> absorbing chemical spills. <br /> <br /> 6.0 Meetings <br /> <br /> 6.1 Contractor shall provide City of Santa Ana staff with a contact person and a phone <br /> number to reach the contact person from the hours of 6:30am - 5:00pm, Monday - <br /> Saturday. <br /> <br /> 33 <br /> 25H-43 <br />