My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25H - AGMT - MASTER LANDSCAPE
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2012
>
01/17/2012
>
25H - AGMT - MASTER LANDSCAPE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2012 10:27:42 AM
Creation date
1/12/2012 4:22:14 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Parks, Recreation, & Community Services
Item #
25H
Date
1/17/2012
Destruction Year
2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br /> <br /> 6.2 Contractor shall appoint and identify to City of Santa Ana staff a "site supervisor". This <br /> site supervisor shall meet with staff as requested at time and place agreed upon by both <br /> parties for as long as the contract is in effect to discuss any problems/concerns that may <br /> arise and any goals for the week. <br /> 6.3 In November of each year for as long as the contract is in effect, Contractor shall <br /> personally meet with staff, along with the designated site supervisor, to discuss and <br /> outline schedules for "Annual Renovations" (listed in Section 10.0). <br /> <br /> 7.0 Daily Infield Maintenance <br /> <br /> 7.1 General <br /> <br /> 7.1.1 Contractor shall remove all litter, broken glass and hazardous debris <br /> from infield and dugout areas. <br /> <br /> 7.1.2 Contractor shall keep brickdust and dugout areas in a weed free <br /> condition. <br /> <br /> 7.1.3 Contractor shall hose and/or sweep and hose out all dugouts so they are <br /> 100% free of brickdust or any other debris. <br /> <br /> 7.2 Maintenance Procedure <br /> <br /> 7.2.1 Retain smooth and level playing surface, using the following daily <br /> procedure. The contractor shall remove all bases before beginning any <br /> work on in-field and re-install after all work on in-field is completed. <br /> <br /> 7.2.2 After removing all bases, the contractor shall scrape/wire brush all base <br /> post anchors and base inserts. This will help facilitate the base removal <br /> and installation. <br /> <br /> 7.2.3 The Contractor shall rake/shovel loose material from high spots back <br /> into low spots/worn areas on running paths, sliding zones, and any other <br /> low spots/worn areas appearing on the field before any watering or <br /> dragging shall take place <br /> <br /> 7.3 Home Plate Area/Batters Box Area Holes <br /> <br /> 7.3.1 Sweep/Rake away all loose brickdust. <br /> <br /> 7.3.2 Wet area until moist. <br /> <br /> 7.3.3 Scarify area (`s) [batters box hole(`s)] with shovel. This will help the <br /> mix bind better. <br /> <br /> 7.3.4 In a 5 gallon bucket mix "mound mix" with water to desired consistency. <br /> Do not use infield mix for this purpose. <br /> <br /> 34 <br /> 25H-44 <br />
The URL can be used to link to this page
Your browser does not support the video tag.