My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25H - AGMT - MASTER LANDSCAPE
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2012
>
01/17/2012
>
25H - AGMT - MASTER LANDSCAPE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2012 10:27:42 AM
Creation date
1/12/2012 4:22:14 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Parks, Recreation, & Community Services
Item #
25H
Date
1/17/2012
Destruction Year
2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br /> <br /> 7.5.6 Contractor shall hand rake all base paths on combination turf/brickdust <br /> infields. <br /> 7.5.7 When the dragging process is complete, the contractor shall stop the drag <br /> in a different location daily. This will stop the accumulation of brickdust <br /> in focused areas. At this time roll-up the drag, place it on the vehicle and <br /> remove all debris accumulated in the drag at this spot and rake out <br /> material emptied from drag. <br /> <br /> 7.5.8 After dragging, hand rake the 18" edges using the "grade or grooming <br /> rake". The rake shall be held at an angle as to not push brickdust <br /> onto/into turf areas. <br /> <br /> 7.5.9 After raking the 18" edges, the contractor shall clean all excess brickdust <br /> on the turf edges utilizing a high pressure water nozzle or heavy duty <br /> broom. NO brickdust shall be permitted on the turf edges at any time.If <br /> in the determination of City staff, an unsafe lip situation exists (an unsafe <br /> lip is %2" or greater) in any turf/brickdust border area infield to brickdust, <br /> base-paths or brickdust to outfield), contractor will be required to <br /> remove or level the soil build-up with a sod cutter and re-establish the in- <br /> field boundaries with a string line or suitable method and re-sod up to the <br /> border to remedy the situation at contractors expense. Pre-existing <br /> conditions shall be corrected during contract start-up. <br /> <br /> 7.6 Final Watering <br /> <br /> 7.6.1 This is the most time consuming and a very important element of the <br /> procedure. <br /> <br /> 7.6.2 The contractor shall final water the skinned brickdust to a depth of 1/4" <br /> minimum. <br /> <br /> 8.0 Rainy Weather/Wet Field Procedure <br /> <br /> 8.1 On the next scheduled working day after a rainfall, the following procedure, in the order <br /> listed, shall be adhered to: <br /> <br /> 8.1.1 Remove all standing water from low spots either by skimming off excess <br /> water and spreading it out to dry areas or using a pump/sopper system. <br /> <br /> 8.1.2 Rake out (scarify) wet areas. <br /> <br /> 8.1.3 Apply Dry Gail Materials "Pro Gold with Stabilizer" Brickdust Materials <br /> from stock to all Wet Areas and Rake Out. <br /> <br /> 9.0 Work to be Completed "BI-MONTHLY" <br /> <br /> 9.1 To maintain levelness of all fields, contractor shall, once every two months, scarify drag <br /> built up amounts of materials at high spots and cut and level drag the scarified material <br /> 36 <br /> 25H-46 <br />
The URL can be used to link to this page
Your browser does not support the video tag.