My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25H - AGMT - MASTER LANDSCAPE
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2012
>
01/17/2012
>
25H - AGMT - MASTER LANDSCAPE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2012 10:27:42 AM
Creation date
1/12/2012 4:22:14 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Parks, Recreation, & Community Services
Item #
25H
Date
1/17/2012
Destruction Year
2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br /> <br /> to low spots. The Contractor shall fill any remaining low spots with new Gail Materials <br /> "Pro Gold with Stabilizer" brickdust from stock and make level. <br /> <br /> Note: Staff shall identify areas to scarify/cut and level drag to <br /> the contractor at weekly meetings with contractors <br /> appointed site supervisor (as per section 6.2 of contract). <br /> 9.2 Heavy water scarified and cut and leveled areas to a 1/2" min. depth and allow settling in <br /> before play on field. <br /> <br /> Note: Due to heavy watering and its need to settle before play, <br /> staff shall provide a schedule of bi-monthly scarify/cut <br /> and level drag dates to contractor. <br /> <br /> 10.0 Work to be Completed "ANNUALLY" <br /> <br /> 10.1 Each year, the following renovation is to be done on all fields in conjunction with the <br /> City's Annual Sports Turf Renovation Schedule. Fields renovated may change from <br /> year to year. <br /> <br /> 10.1.1 Contractor shall laser grade each ball diamond. Contractor shall scarify <br /> drag built up amounts of materials at high spots and cut and level drag <br /> the scarified material to low spots. The Contractor shall fill any <br /> remaining low spots with new Gail Materials "Pro Gold with Stabilizer" <br /> brickdust from stock and make level. <br /> <br /> Note: Staff shall identify areas to scarify/cut and level drag at <br /> the November meeting with contractor's owner (as per <br /> section 6.3 of contract). <br /> <br /> 10.1.2 Contractor shall verify all base distances, pitching rubber distances and <br /> pitching mound heights per the Little League, Pony/Colt League <br /> specifications for each specific field. Contractor shall repair any <br /> specifications not being met on any field. <br /> <br /> <br /> 10.1.3 In addition, contractor shall install 1/2" new Gail Materials "Pro-gold <br /> with Stabilizer" (brickdust) to in-fields at all diamonds (minimum 26 <br /> tons per Girls Softball/Major Little League Field and minimum 40 tons <br /> per Junior/Senior Little League Field). Also, the contractor shall install a <br /> minimum of 1 ton of Turface calcite clay per Girls Softball/Major Little <br /> League Field and 2 tons of Turface calcite clay to Junior/Senior Little <br /> League Fields Responsibility for and purchase of necessary materials <br /> shall be at contractor's expense. <br /> <br /> Note: The City has the right to move brickdust and Turface <br /> materials to other infields under this agreement should <br /> they decide that an infield or infields do not require <br /> additional materials a particular year. <br /> 37 <br /> 25H-47 <br />
The URL can be used to link to this page
Your browser does not support the video tag.