Laserfiche WebLink
Kenneth Kasbohm, P.L.S. <br />PROFESSIONAL EXPERIENCE <br />Project Surveyor - Field <br />Mr. Kasbohm has over 33 years of surveying experience in the field performing ail <br />types of surveying including vertical and horizontal control, photo control, GPS <br />COASTsurveys, <br />topographic surveys, design surveys, boundary surveys, right of way <br />surveys, and construction layout. I\It. Kasbohm is a Professional Land Surveyor in <br />SURVEYING, INC. <br />California, a Certified Party Chief and has been Hazmat trained since 1986. <br />SURVEY PARTY CHIEF EXPERIENCE <br />YEARS OF EXPERIENCE <br />Route 91 Freeway from 1 -15 Freeway to McKinley Street in Corona for the <br />Riverside County Transportation Commission. Work consisted of construction <br />Total Years Experience: 33 Years <br />staking for freeway widening, addition of auxiliary lanes, retaining walls, and slope <br />With Coast: 20 Years <br />staking. <br />With Other Firms: 13 Years <br />Bristol Street / 1 -405 Interchange in Costa Mesa, California for the City of <br />Costa Mesa thru Kasler Corporation. Work consisted of construction staking for <br />EDUCATION <br />three new on -off ramps, bridge widening on Bristol Street over the 405 Freeway <br />and widening of Bristol Street north and south of the freeway. <br />Degree: Certificate <br />Specialization: Civil Engineering <br />Route 241 Freeway (Foothill Corridor) - Portola Parkway to Lake Forest <br />Technology <br />Drive in Lake Forest, California for the Transportation Corridor Agencies <br />Year: 1976 <br />thru Ebensteiner Co. Work consisted of construction staking of 1.7 miles of new <br />North Dakota State <br />freeway (Foothill Corridor) for the Transportation Corridor Agencies to Caltrans' <br />School of Science <br />specifications and standards: rough grade /slope stakes for both sides and centerline <br />of freeway, eight ramps, access roadway; layout stakes for box culverts, R.C.P., pre - <br />Degree: Continuing <br />cast concrete drain lines, and drain inlets; finish grade offset stakes for both sides <br />Education <br />of eastbound and westbound roadways, centerline, eight ramps, Lake Forest Drive <br />Specialization: Land Surveying <br />and Portola Parkway; construction layout for six bridges; staking for fence on right - <br />Santa Ana College <br />of -way; prepare slope stake listing; final monumentation; and vertical and <br />horizontal control. <br />REGISTRATION <br />Route 91 Freeway HOV - Route 55 to Riverside County Line in Anaheim, & <br />Yorba Linda, California for the California Private Transportation Corp. thru <br />1997 / Professional Land Surveyor <br />Kiewit 91. The scope of work involved providing quality control /quality assurance <br />#7371 / California <br />verification surveys as needed for the construction of 10 miles of new privatized <br />HOV tollways. The project included numerous retaining walls & soundwalls, <br />1985 / Certified Party Chief <br />median paving, bridge widening, major interchange redesign, detours, and all <br />Local 12, Operating Engineers <br />associated survey control - conventional and CPS. <br />1986 / 40 -Hour Hazardous Material <br />San Joaquin Hills Transportation Corridor State Route 73) in Orange <br />Training per OSIIA 29.CFR 1901.120 <br />County, California for the Transportation Corridor Agencies. Work consisted <br />Local 12, Operating Engineers <br />of preparation and /or review of legal descriptions and sketches, acreage <br />calculations, and exhibits for various properties; preparation and revision of <br />constraints maps; review preliminary title reports along with revisions or updates; <br />provide fee credit acreage calculations and exhibit maps; reviewing final policies of <br />title and policy binders for accuracy of descriptions; field reconnaissance with <br />builders surveyor of all horizontal and vertical control monumentation; maintain <br />primary control network; staking the perimeters of no -work or limited -work areas <br />designated as archaeological or biological resources; providing oversight <br />verification surveys as directed by the Construction Engineering Manager (CEN1) <br />for bridges, structures, walls, drainage, slopes, and finished surfaces as needed for <br />the construction of 20 miles of new tollways. <br />