My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
19E - REQUEST FOR PROPOSALS FOR ON-CALL DEMOLITION SERVICES
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2012
>
02/06/2012
>
19E - REQUEST FOR PROPOSALS FOR ON-CALL DEMOLITION SERVICES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2012 5:26:19 PM
Creation date
2/2/2012 3:12:49 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
19E
Date
2/6/2012
Destruction Year
2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT 1 <br />SCOPE OF WORK <br />DEMOLITION: <br />Contractor is responsible for the payment of all applicable permits required by the City of <br />Santa Ana. <br />Contractor is responsible for demolishing all improvements, including but not limited to: <br />foundations and footings, slabs, basement, detached garage and all landscaping. Contractor <br />is also responsible for clearing the site, grading the parcel for drainage, importing and <br />exporting fill dirt as needed, capping all sewer lines, and compacting to 90% density. <br />All work is to be done in accordance with all applicable federal, state and local regulations, <br />standards and codes governing demolition and any other trade work done in conjunction with <br />the demolition. Copies of all demolition permits, sewer cap inspection approval and a letter of <br />completion should be submitted for City's files prior to the Contractor receiving payment. <br />The Contractor shall supply all necessary labor, materials, services, insurance, permits, and <br />equipment to carry out the work in accordance with all applicable federal, state, and local <br />regulations. The Contractor at all times shall keep the Project site free from accumulation of <br />waste materials or rubbish caused by the Contractor's operations. At the completion of each <br />trade of the work, and at final completion prior to contractor submitting the final invoice, <br />Contractor shall remove all waste materials, and rubbish from and about the project as well <br />as tools, construction equipment, machinery, and surplus materials. <br />Asbestos Abatement: <br />The work described herein consists of removal and disposal of ALL asbestos containing <br />materials (ACM-friable or nonfriable) and subsequent cleaning of the sites in accordance with <br />all applicable federal, state and local regulations, standards and codes governing asbestos <br />and any other trade work done in conjunction with the abatement. Results of any testing that <br />identify asbestos containing materials will be provided by the City. It is the responsibility of <br />the Consultant to determine if any additional asbestos removal is required in addition to the <br />surveys. <br />Lead: <br />The provided report indicates that lead was not detected at concentrations in excess of 600 <br />parts per million (ppm) in any of the samples collected. However, the Contractor shall take all <br />necessary precautions and follow all OSHA's guidelines required in the handling of lead <br />contained materials if any are detected. Please refer to the Lead Hazard Evaluation Report. <br />Copies of all notifications must be submitted to City including, abatement contractors license, <br />map and/or clear documentation specifying asbestos containing materials abated; completed <br />waste manifests; and a completion letter indicating that all asbestos containing materials from <br />these properties have been abated and properties are ready to be demolished. <br />Page 11 of 27 <br />19E-13
The URL can be used to link to this page
Your browser does not support the video tag.