Laserfiche WebLink
tasks and specify who would perform them. <br />(3) Furnish a project schedule for completing the tasks in terms of elapsed weeks <br />from the project commencement date. <br />(4) Identify methods that Consultant will use to ensure quality control as well as <br />budget and schedule control for the project. <br />(5) Identify any special issues or problems that are likely to be encountered in this <br />project and how the Consultant would propose to address them. <br />(6) Consultant is encouraged to propose enhancements or procedural or technical <br />innovations to the Scope of Work that do not materialy deviate from the <br />objectives or required content of the project. <br />d. Exceptions/Deviations <br />State any exceptions to or deviations from the requirements of this RFP, segregating <br />"technical" exceptions from "contractual" exceptions. Where Consultant wishes to <br />propose alternative approaches to meeting the City's technical or contractual <br />requirements, these should be thoroughly explained. If no contractual exceptions are <br />noted, Consultant will be deemed to have accepted the contract requirements as set <br />forth in ATTACHMENT 5. <br />e. Cost and Price Proposal <br />As part of the cost and price proposal, the Consultant shall submit Demolition Services <br />Consultant Comparison Form (ATTACHMENT 2), to provide the services for the <br />subject property task described. Consultant shall complete Demolition Services <br />Designation of Subcontractors Form (ATTACHMENT 3) and shall complete the <br />Demolition Services Experience Form (ATTACHMENT 4) included with this RFP, and <br />furnish any narrative required to explain the prices quoted in the schedules. The <br />Agreement will have a per work order type of payment provision. The consultant shall <br />submit a total project cost in response to individual project scope of work. Each Total <br />Project Cost will have an estimated price, and the consultant shall exercise due <br />diligence to perform its work within the estimated price. <br />2. Appendices <br />Information considered by Consultant to be pertinent to this project and which has not <br />been specifically solicited in any of the aforementioned sections may be placed in a <br />separate appendix section. Consultants are cautioned, however, that this does not <br />constitute an invitation to submit large amounts of extraneous materials. Appendices <br />should be relevant and brief. <br />REFERENCES <br />Provide a minimum of three (3) references for similar projects performed only within the past <br />Page 6 of 27 <br />19E-8