Laserfiche WebLink
<br /> <br /> <br /> <br /> <br /> <br /> ? Tustin Avenue between Fourth Street and Seventeenth Street <br /> ? Fourth Street between 1-5, NB Ramps and 1-55 SB Ramps <br /> <br /> ? Any additional segment as necessitated by the assessment of neighborhood traffic. <br /> • Analysis of delivery trucks accessibility, their impact upon the street bordering the site and <br /> recommendations to mitigate said impacts. <br /> <br /> • Internal circulation, particularly with respect to vehicular queues at driveways, required <br /> stacking distance and potential impacts upon on-street traffic. <br /> • The project scenario analysis must include a scenario that isolates project impacts. <br /> <br /> • Specific intersection control analysis at all unsignalized intersections. Please note that this is <br /> not a request to install a traffic signal. <br /> <br /> • An assessment and recommendations of existing and future geometric/striping of all end- <br /> block locations presented above. <br /> • The study must include detailed assessment of potential impacts on the adjacent residential <br /> component. Recommendations to minimize or eliminate impacts must be clearly identified. <br /> <br /> • Meet with City staff to verify/determine other concerns and issues relative to the <br /> development of the project. Discuss the key intersections to be analyzed, obtain traffic count <br /> information and background data either available in City files of contained in other traffic <br /> reports for the area. <br /> • Field inspect the subject roadway areas and inventory the existing street system as to base <br /> line width, striping patterns, and traffic. <br /> <br /> • Collect traffic counts on key site area roadways and intersections. These counts will include <br /> morning and afternoon peak hour turning movements as well as 24-hour daily volumes at <br /> locations between selected intersections. <br /> • Study shall include scenario analysis as follow: <br /> <br /> ? Existing Conditions - utilized to establish the current level or existing baseline of <br /> traffic operations. <br /> ? 2015 Project Opening Year No Project Conditions - establishes project opening year <br /> baseline to evaluate the proposed Project. <br /> ? 2015 Project Opening Year with Project Conditions - represents project opening year <br /> baseline traffic conditions. <br /> <br /> ? 2035 Project Design Year No Project Conditions - establishes future year baseline to <br /> evaluate the proposed Project. <br /> ? 2035 Project Design Year with Project Conditions - represents future year baseline <br /> traffic conditions with the proposed Project. <br /> <br /> NOTE: for the purposes of this analysis, the Metro East Overlay shall be used. City staff will <br /> provide information. <br /> 10 <br /> <br /> <br /> 19E-12 <br />