My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-001 - Statement of Overriding Considerations, and Adopting a Mitigation Monitoring and Reporting Program
Clerk
>
Resolutions
>
CITY COUNCIL
>
2011 -
>
2012
>
2012-001 - Statement of Overriding Considerations, and Adopting a Mitigation Monitoring and Reporting Program
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2012 3:02:32 PM
Creation date
2/28/2012 2:56:36 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Date
2/21/2012
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />• <br />• <br />Chapter 3 Findings Regarding Project AltematAes Attachment 'A' <br />3.4.1.2 Comparison of Environmental Effects <br />The impacts of this alternative were evaluated and compared to those of the Project. As concluded in <br />the Final EIR, implementation of the No Project Alternative would eliminate all of the Project's near- <br />term construction-related impacts. However, several long-term impacts would increase with <br />implementation of this alternative, including increased impacts to air quality, hazards/hazardous <br />materials, transportation/traffic, and water quality/hydrology. Long-term impacts from noise would <br />be slightly reduced under this alternative due to the increased distance between the existing lift <br />station facility and nearby sensitive receptors. <br />3.4.1.3 Finding and Rationale for the No Project Alternative <br />The City hereby finds that specific economic, legal, social, technological, or other considerations <br />make the No Project Alternative infeasible. <br />Although the No Project Alternative would avoid all of the Project's near-term construction-related <br />environmental effects, including the Project's significant an unavoidable impact to the intersection of <br />South Bristol Street/West Segerstrom during the implementation of Construction Configuration C.2, <br />this alternative would not meet any of the Project's basic objectives. Specifically: <br />• The No Project Alternative would not result in the construction of a replacement lift station <br />to replace the existing lift station that has exceeded its design life. <br />• The No Project Alternative would not allow for the installation of modern lift station <br />equipment and associated wastewater conveyance infrastructure that would reduce the <br />potential for sewer spills or equipment failure. <br />• The No Project Alternative would not provide for a replacement lift station facility in which <br />electrical components are housed above ground to preclude the potential for electrical failure <br />during peak storm events, as the existing lift station facility houses all of its electrical <br />equipment underground and is subject to flooding. <br />• The No Project Alternative would not provide for a facility that accommodates sufficient <br />access space for maintenance workers, as the existing facility is located beneath the crown of <br />South Bristol Street and affords very little space for maintenance workers. <br />• The No Project Alternative would not avoid detrimental effects to existing businesses, as the <br />existing lift station would continue to require frequent maintenance to clear blockages due to <br />debris collected in the system and the risk from a sewage spill under the No Project <br />Alternative would be increased in comparison to the proposed Project. <br />• The No Project Alternative would not improve safety for motorists and City workers, as the <br />existing lift station is located within the right-of-way of South Bristol Street, a major City <br />thoroughfare. <br />• The No Project Alternative would not reduce the potential for odor-related nuisances to land <br />uses in close proximity to the facility, as no new odor-control systems would be installed. <br />• The No Project Alternative would not provide for hardscape and landscape improvements <br />and would not result in the demolition of the existing outdated facility. <br />The No Project Alternative would not meet the basic Project objectives and therefore would not <br />provide the numerous benefits of the Project, as set forth in the Statement of Overriding <br />Considerations, including the installation of a replacement lift station facility that reduces the <br />San Lorenzo Lift Station EIR (Project No. 06-3510) 3-4 <br />CEQA Findings of Fact/Statement of Overriding Considerations
The URL can be used to link to this page
Your browser does not support the video tag.