My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ALL AMERICAN ASPHALT (7)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
Completed Projects
>
ALL AMERICAN ASPHALT (7)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2024 11:40:28 AM
Creation date
3/12/2012 2:43:33 PM
Metadata
Fields
Template:
Contracts
Company Name
ALL AMERICAN ASPHALT
Contract #
Various
Agency
Public Works
Council Approval Date
6/18/2007
Expiration Date
3/16/2012
Destruction Year
2012
Notes
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br /> <br /> MAYOR CITY MANAGER <br /> Miguel A. Pulido ki David N. Ream <br /> MAYOR PRO TEM CITY ATTORNEY <br /> Claudia C. Alvarez Joseph W. Fletcher <br /> COUNCILMEMBERS CLERK OF THE COUNCIL <br /> David Benavides Patricia E. Healy <br /> Carlos Bustamante <br /> Michele Martinez CITY OF SANTA ANA <br /> Vincent F. Sarmiento <br /> Sal Tinajero PUBLIC WORKS AGENCY M-36 <br /> P.O. Box 1988 <br /> Santa Ana, California 92702 <br /> March 20, 2009 <br /> ADDENDUM No. TWO <br /> SUBJECT: PROJECT NO. 06-1500, 07-3206, AND 09-3521: Bristol Street Widening Phase I <br /> From McFadden Avenue to Pine Street <br /> The following changes have been made to plans and specifications of the subject project: <br /> Specifications <br /> 1. Page viii and page 1, revise the number of working days to read: <br /> Page viii <br /> "The time for completion of this contract is 260 working days for construction, 200 working days for <br /> construction and 60 working days for the landscape and irrigation maintenance period. Liquidated <br /> damages of $5,000 per calendar day for construction not completed within the allotted number of <br /> working days from the effective date of Notice to Proceed and milestone of specific work." <br /> Pam <br /> "The Contractor shall complete all work under the contract within 260 working days from the date of <br /> the Notice to Proceed issued by the Engineer, the first 200 working_das of which is for construction, <br /> and the last 60 working days for the landscape and irrigation maintenance period..." <br /> <br /> 2. Pages BP-2, 3, 5, & 7, replace with the attached pages BP-2, 3, 5, & 7. <br /> <br /> 3. Page 2 Section 1.03 Time of Completion, remove the special time frame construction restrictions. <br /> <br /> 4. Page 5 Section 1.13 Utilities, replace the fifth paragraph of page 5 to read: <br /> <br /> "MWD: The Contractor shall coordinate all work affecting the Metropolitan Water District's (MWD) <br /> facilities in accordance with MWD's requirements as shown in Appendix "F". Contractor shall submit <br /> separate work schedule to MWD for work done at the Willits structure and SA-03 at Bristol and <br /> McFadden. See appendix F for more details." <br /> 5. Page 14 Section 2.04 Unclassified Excavation, revise the second paragraph of this section to read: <br /> <br /> "Unclassified excavation shall consist of all excavation including sawcutting and removal of roadways, <br /> bituminous pavement, concrete pavement and the removal of curbs, sidewalks, and driveways, etc. <br /> including the removal of subgrade to meet the grades for the proposed improvements as shown on the <br /> plans." <br />
The URL can be used to link to this page
Your browser does not support the video tag.