<br /> <br /> <br /> <br /> <br /> March 20, 2009 <br /> ADDENDUM NO. TWO <br /> PROJECT NO. 06-1500, 07-3206, & 09-3521 <br /> Page 2 <br /> 6. Page 15 Section 2.05 Subgrade Preparation, delete the third paragraph in Section 2.05. <br /> <br /> 7. Page 16 Section 2.05 Subgrade Preparation, delete the last sentence of the first paragraph on page 16. <br /> <br /> 8. Page 27 & 28 Masonry Block Sound Wall and CMU Block Retaining Wall, remove moisture barrier <br /> sheet 16-mil plastic liner and replace with Waterproofing Coating, Henry's "Aqua Block WB" or <br /> approved equal. <br /> 9. Page 30, add Section 2.21 7-11 Parking Lot Improvements to read as following and add the attached <br /> sign detail to Appendix J: <br /> <br /> "2.21 7-11 PARKING LOT IMPROVEMENTS <br /> Payment for 7-11 Parking Lot Improvement shall be at the contract unit price bid per lump sum and <br /> shall include all the construction work shown on the plan sheets OSI-01, OSI-02, and OSI-03 which <br /> including, but not limited to, the unclassified excavation, AC pavement, Portland Cement Concrete, <br /> landscaping, irrigation, lighting, removal and relocate of store sign, foundation, modify sign electrical <br /> conduit, junction box, reconnect electrical service for the sign, electrical lighting, striping, and shall <br /> include full compensation for all submittals, equipment, labor materials, and incidentals required to <br /> construct the Parking Lot Improvements at the 7-11 store site." <br /> <br /> 10. Page 126 Section 11.02 Project Phasing and lane requirements, replace the first sentence on page 126 <br /> to read: <br /> "1. The project shall be divided into three phases. The contractor may propose different phasing <br /> scenarios that will require the approval of the Engineer." <br /> <br /> Plans <br /> <br /> 1. Sheet 3 of 59 (RE-01) at the 7-11 site, replace the disposition note "J" on the Large Sign 7-11 to "See <br /> Appendix J" <br /> <br /> 2. Sheet 53 of 59 (LA-1) Plant List, disregard the quantities shown on the Plant List summary. The <br /> plant material quantities shall be determined from the individual locations as shown on each <br /> landscaping plan sheet. Revise the plant material at the northeast corner of Bristol and McFadden <br /> from symbol E (qty 5) to symbol G (qty 5). <br /> <br /> 3. Appendix F, sheet C-2, note #7, revise the note to read: <br /> <br /> "7. For piping modification to Service Connection SA-03, refer to CSA Plan No. W-365 sheet 12 <br /> of 22." <br /> 4. Appendix F, sheet C-3, remove the 8" RCP Storm Drain and 4" steel sump pump discharge line from <br /> the plan. Connect 4" PVC sump pump discharge line to 4" Steel pipe, connections, and supports. <br /> Water shall be discharged through the curb face. See attached 8 '/2" x 11" revised plan. <br />