Laserfiche WebLink
<br /> <br /> <br /> <br /> <br /> March 20, 2009 <br /> ADDENDUM NO. TWO <br /> PROJECT NO. 06-1500, 07-3206, & 09-3521 <br /> Page 3 <br /> <br /> 5. Appendix F, sheet C-4, note #5, revise the note to read: <br /> "5. For removal and installation of mechanical equipment inside structure, see detail 4, sheet M-1." <br /> <br /> Clarifications to the Plans <br /> <br /> 1) Sheet 3 of 59. At the NE corner of Bristol and McFadden, the existing "Starwok Express" building, <br /> monument sign and payphone will be demolished by the City prior to construction. <br /> <br /> 2) Sheet 30 of 59. CMU texture for sound walls and 6' block wall shall have one side split-face with the <br /> split-face on street side. CMU block retaining wall (H=4'-8" per sheet 21 of 59 construction note 18) <br /> shall have plain CMU block. <br /> <br /> 3) Sheets 46, 48, & 49 of 59. The water meters shown on the irrigation plans are for schematic only. The <br /> 2" water meter for irrigation shall be constructed as part of the Water Main Improvement Plan W-365 <br /> construction note #50. <br /> <br /> All other terms and conditions including the bid opening date and time remain the same. <br /> <br /> FOR THE CITY OF SANTA ANA <br /> <br /> <br /> omo a~ <br /> George Alvarez <br /> City Engineer <br />